Globalization and increasing competition made the completion of projects on time foreseen and with available resources mandatory. Therefore, to conduct the cost and the time components of projects at the optimal level, effective project management is needed and project planning techniques are utilized. For large-scale projects, the most important source of success is certainly a good project plan and project management. The productivity of the projects will increase with a good project management and it creates opportunities for companies. The purpose of this study is to make the project plans of the projects of oil well drilling with similar depths in different locations by using PERT-CPM projectplanning techniques and to reveal how the differences of location affects the time and costs of the projects. Another purpose is to make the implementation of the project-planning techniques in a different sector be contributed to the literature. The implementation of the PERT-CPM techniques on two oil well projects is included in the study via WINQSB program. The time of the activities to be performed were estimated for the relevant projects and the project plans were prepared. Besides, the transactions of the total costs estimations were carried out. Budget constraints were determined by the project engineers of the Company, the acceleration acts to each point of time possible under these budget constraints were performed, and out of these accelerated project plans, optimal project plans were obtained for each well. Based on the assumption that no delays occurred in the activities during the projects, it was projected that as a result of the implementation of the optimal plans, the relevant projects could be completed before their expected completion times with 13,89% and 7,36% profits, respectively. Consequently, it is thought that it would be beneficial to the companies to use the new project plans made in accordance with the optimal acceleration points at the management and control stage of the projects having high cost and risk elements. The study, which based on the data supplied from a petroleum company, was carried out in cooperation with the Petroleum Engineers having field experience.

___

  • Coşkun, O., Ekmekçi, İ. (2012). Bir İnşaat Projesinin Evreleri ile Zaman ve Maliyet Analizinin Proje Yönetim Teknikleri Vasıtasıyla İncelenmesi. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi, 10(20).
  • Daigh, S. L. (2012). Helicopter Final Assembly Critical Path Analysis, MSc Thesis, Massachusetts Institute of Technology Department of Mechanical Engineering, Cambridge.
  • Gaither, N. (1980). Production and Operation Management: A Problem Solving and Decision-Making Approach. New York: The Dryden Press, 297.
  • Gibbs, M., (1984). The Management of Operations. New York: John Wiley and Sons Inc.
  • Gür, İ., (2006). Proje Yönetiminde PERT-CPM’in Proses Modeli ile Simüle Edilmesi ve Bir Uygulama. Yüksek Lisans Tezi, Gebze İleri teknoloji Enstitüsü/Sosyal Bilimler Enstitüsü, Gebze.
  • Karadeniz, C. Ö. (2006). PERT-CPM ile Proje Planlama, Değerlendirme ve Bir İşletme Uygulaması, Yüksek Lisans Tezi, Marmara Üniversitesi Sosyal Bilimler Enstitüsü, İstanbul.
  • Kır, E., (2007), Yazılım Sektöründe Proje Yönetimi, Yüksek Lisans Tezi, Kadir Has Üniversitesi, Sosyal Bilimler Enstitüsü.
  • Özkan, Ş., (2005). Yöneylem Araştırması Nicel Karar Teknikleri, Ankara: Nobel Yayın Dağıtım.
  • Öztürk, A. (1987). Yöneylem Araştırması. Bursa: Uludağ Üniversitesi Yayınları, 189.
  • Rençber, B. A. (2011). Proje Yönetiminde PERT Tekniği ve Bir Uygulama.Gazi Üniversitesi Endüstriyel Sanatlar Eğitim Fakültesi Dergisi, (27), 31.
  • Sarıca, İ. (2006). CPM ve PERT Teknikleriyle Proje Planlama ve Bir İşletmede Uygulanması, Yüksek Lisans Tezi, Uludağ Üniversitesi Sosyal Bilimler Enstitüsü, Bursa, 19-29.
  • Timör, M. (2010). Yöneylem Araştırması. İstanbul: Türkmen Kitabevi, 448.
  • Yamak, O. (1998). Proje Yönetim Teknikleri. İstanbul, 2.