Bir raylı ulaşım sisteminde personel çizelgelemeye bütünleşik yaklaşım

Bu çalışmada Özkarahan'ın (1) Bütünleşik Hemşire Çizelgeleme Modeli ulaşım raylı sisteminde sürücü çizelgelenmesine uygulandı. Çıkan sonuçların sefer ve sürücü sayısına göre maliyet analizi yapıldı. Çalışmanın sonuçları geliştirilen modelin maliyetinin, mevcut sistemin maliyetinden daha da az olduğunu göstermektedir. Modelin analizinde Microsoft Excel ve QSB paket programı destek aracı olarak kullanıldı.

An integrated approach to personnel scheduling in a light-railway transportation system

In this study, Ozkarahan's (1) integrated nurses scheduling has been implemented to a light-railway system. Cost analyser are carried out based on the number of departures and drivers. The results of the study show that the operating cost of the applied model is significantly less than that of the existing system. The applied model has been analysed by The Microsoft Excel and QSB.

___

  • 1.Ozkarahan, I., "An integrated nurse scheduling modeli','Journal of the Society for Healt Systems, 3, 2, 79-101, (1991).
  • 2.Bedworth, D.D., Bailey, J.E., Integrated Production Control Systems, Second Edition, John Wiley&Sons, 387-419, (1987).
  • 3.Topaloğlu, Ş.A., A research on Optimization Based Modeling for Personnel Tour Scheduling Problems with Flexible Break Assigments, Yüksek Lisans Tezi, Fen Bilimleri Enstitüsü, İzmir, (1997).
  • 4.Bechtold, S.E., Jacobs L.W., "Implicit modeling of flexible break assignments in optimal shift scheduling", Management Science, 36, 11, 1339-1351, (1990).
  • 5.Baker, K.R., "Workforce allocation in cyclical scheduling problems: A survey", Operational Research Quarterly, 1, 155-167, (1976).
  • 6.Henderson, W.B., Berry, W.L., "Heuristic methods for telephone operator shift scheduling: An experimental analysis", Management Science, 22, 12, 1372-1380, (1976).
  • 7.Thompson, G.M., "Improved implicit optimal modeling of the labor shift scheduling problem", Management Science, 41, 4, 595-607, (1995).
  • 8.Tibrewala, R., Philippe D., Browne, J., "Optimal scheduling of two consecutive idle periods", Management Science, 19, 1, 71-75, (1972).
  • 9.Burns, R.N., Carter, M.W., "Work force size and single shift schedules with variable demands", Management Science, 31,5, 599-607, (1985).
  • 10.Mabert, V.A., Watts, C.A., "A simulation analysis of tour-shift construction procedures", Management Science, 28, 5, 520-532, (1982).
  • 11.Brusco, M.J., "Solving personnel tour scheduling problems using the dual all-integer cutting plane", IIE Transactions, 30, 9, (1998).
  • 12.Jarrah, A.Z., Bard, J.F., deSilva, A.H., "Solving large-scale tour scheduling problems", Management Science, 40, 9, 1124-1144, (1994).
  • 13.Ozkarahan, I, "A disaggregation model of a flexible nurse scheduling support system", Journal of Soeio Economic Planning Sciencies, Vol.25, No.l, 9-26, (1991).
  • 14.Pegden, CD., Shannon, R.E., Sadowski, R.P., Introduction to Simulation Using Siman, Me Graw-Hill, (1990).