Reducing lead time using fuzzy logic at job shop

One problem encountering at the job shop scheduling is minimum production size of machine is different from each another. This case increases lead time. A new approach was improved to reduce lead time. In this new approach, the parts, which materials are in stock and orders coming very frequently are assigned to machine to reduce lead time. Due the fact that there are a lot of machine and orders, it is possible to become some problems. In this paper, fuzzy logic is used to cope with this problem. New approach was simulated at the job sop that has owner 15 machinery and 50 orders. Simulation results showed that new approach reduced lead time between 27.89% and 32.36%.

___

AMAR, A.D. and XIAO, B., 1997, "Scheduling on a bottleneck station: a comprehensive cost model and heuristic algorithms", International Journal of Production Research, Vol. 3 5, No. 4, ss.1 0 I 1-1030.

AYDIN, Mehmet Emin, 1997, Zeki Etmenlerde Ogrenme Kabiliyetinin Geliştirilmesi ve Bir Dinamik Atolye Tipi Cizelgeleme Uygulaması, Doktora Tezi, SAU Fen Bilimleri Enstitusu, Adapazarı.

CHASE, Richard B., AQUILANO, Nicholas J., JACOBS, F. Robert, 1998, Production and Operations Management: Manufacturing and Services, McGraw-Hill Companies.

CUSTODIO, Luis M.M., SENTIEIRO, Joao J. S. and BISPO, Carlos F. G., 1994, "Production Planning and Scheduling Using a Fuzzy Decision System", IEEE Transactions on Robotics and Automation, Vol. 10, No. 2, 160-168.

DUNDAR, M. Fahri, 1996, Bulanık Kumeler ve Endustri Muhendisligi Uygulamaları, Yuksek Lisans Tezi, İTU Fen Bilimleri Enstitusu, İstanbul.

FORTEMPS, Philippe, 1997, Job Shop Scheduling with Imprecise Durations: A Fuzzy Approach, IEEE Transactions on Fuzzy Systems, 5, 557-569.

GUNDOGAR, Emin, 1991 a, Atolye Tipi Uretim İcin Moduler Cizelgeleme ve Kontrol Paketi, Doktora Tezi. İTU Fen Bilimleri Enstitusu, İstanbul.