Deterministik ve Stokastik Talep Varsayımları Altında Envanter Parti Büyüklüğü Belirleme Problemi İçin Modeller

Üretim planlamasının en önemli ve en zor problemlerden biri parti büyüklüğü belirleme problemidir. Parti büyüklüğü problemleri literatürde oldukça geniş bir şekilde çalışılmaktadır. Bu çalışmada, parti büyüklüğü problemi için bazı çözüm yaklaşımları gözden geçirilmiş ve bu konuda yapılmış daha önceki çalışmalar incelenmiştir.

Models of Inventory Lot-Sizing Problem Under Deterministic and Stochastic Demand Assumptions

Lot sizing is one of the most important and also one of the most difficult problems in production planning. This subject has been studied extensively in the literature. In this study, single-level lot sizing problems and some solution approaches are reviewed and previous studies on these subjects are examined.

___

  • KAYNAKÇA Bookbinder, J.H. and J.Y. Tan (1988) "Strategies for the Probabilistic Lot-Sizing Problem with Service-Level Constraints", Management Science, 34, 1096-1108.
  • Can, M. (2000) Belirsiz Talep Altında Envanter Modellemesi ve (s, S) ve (t; S) Karşılaştırması, Yayınlanmamış Yüksek Lisans Tezi, Ankara: Hacettepe Üniversitesi.
  • Debodt, M.A., L.F. Gelders, L.N. Wassenhove (1984) "Lot Sizing Under Dynamic Demand Conditions: a Review", Engineering Costs and Production Economics, 8, 165-187.
  • Gupta Y.P. and Y. Keung (1990) "A Review of Multi-Stage Lot-Sizing Models", International Journal of Operations and Production Management, 10, 57-73.
  • Harris, F.W. (1915) "Operations and cost", Factory Management Series, Chicago: Shaw, 48-52.
  • Karimi, B., F. Ghomi and J.M. Wilson (2003) "The Capacitated Lot Sizing Problem: a Review of Models and Algorithms", The International Journal of Management Science, 31, 365-378.
  • Lee H.L. and Nahmias (1993) S. Logistics of Production and Invemtory, S.C. Graves, A.H.G. Rinnory Kan and P.H. Zipkin (eds.), Handbooks in Opertions Research and Management Science, Vol: 4, North-Holland.
  • Scarf, H. (1960). "The Optimality of (s,S) Policies in the Dynamic Inventory Problem", K.J. Arrow, S. Karlin and P. Suppes, Mathematical Methods in the Social Sciences 1959, Stanford University Press, 196-202.
  • Silver E.A. and H.C. Meal (1973) "A Heuristic for Selecting Lot Size Requirements For the Case of a Deterministic Time-Vary ing Demand Rate and Discrete Opportunities for Replenishment", Production and Inventory Management, 14(2), 64-74.
  • Silver, E. (1978) "Inventory Control Under a Probabilistic Time-Varying, Demand Pattern," AIIE Transactions, 10, 371-379.
  • Taha, A.H. (1987) Operations Research an Introduction, (4th ed.), NewYork: Macmillan Publishing Co.
  • Tarim, S.A. and B.G. Kingsman (2004) "The Stochastic Dynamic Production/Inventory lot-Sizing Problem with Services-Level Constraints", International Journal of Production Economics, 88, 105-119.
  • Wagner, H.M. and T.M. Whitin (1958) "Dynamic Version of the Economic Lot Size Model", Management Science, 5: 89-96.
  • Winston, W. (1994) Operations Research, USA: Duxbury Press.
  • Zangwill, W. (1969) "A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System-A Network Approach", Management Science, 15(9), 506-52.
Hacettepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi-Cover
  • Yayın Aralığı: 4
  • Başlangıç: 1983
  • Yayıncı: Hacettepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dekanlığı