Effective Framework for Change Order Management Using Analytical Hierarchy Process (AHP)

Construction projects are of very complex nature and come along with an intrinsic but undesirable property of change orders. The purpose of this paper is to propose an effective framework for the change order management in the construction industry. This is achieved by investigating and identifying various causes of change orders and their impact on project objectives like project duration, cost, and quality. The data for this project were gathered by conducting a survey among the professionals like owners, project management consultants, design/supervision consultants and contractors in construction industry. The survey respondents were requested to provide feedback on the impact of change orders on project duration, cost and quality. Initially, the data collected from 105 professionals was analyzed through Relative Importance Index (RII). Furthermore, multiple objective decision technique of Analytical Hierarchy Process (AHP) was applied to rank the causes of change orders according to their impact on project duration, cost and quality considered collectively. According to AHP, the top three causes of change orders with highest cumulative impact on project duration, cost and quality were, “Change in specifications by the owner”, “Change of plans or scope by the owner”, and “Poor project planning by the contractor”. This paper also suggests improvements for the existing change order management processes and ranks these suggestions according to their role in reducing impact on project duration, cost and quality. The proposed framework can be adjusted to suit individual construction projects with different relative importance of project objectives.

___

  • Adam, A., Josephson, P., Lindahl, G. (2014) "Implications of cost overruns and time delays on major public construction projects". Proceedings of the 19th International Symposium on the Advancement of Construction Management and Real Estate, 7-9 Nov 2014, Chongqing.Al-Najjar, J.M. (2008), "Factors influencing time and cost overruns on construction projects in the Gaza Strip." MS Thesis, Islamic University of Gaza, Gaza Strip.Alnuaimi, A.S., Taha, R.A., Al Mohsin, M., Al-Harthi, A.S. Causes, effects, benefits, and remedies of change orders on public construction projects in Oman, (2010) Journal of Construction Engineering and Management, 136 (5), pp. 615-622., http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000154 Anees, M.M., Mohamed, H.E., Abdel Razek, M.E. (2013), “Evaluation of change management efficiency of construction contractors, HBRC Journal 9(1), pp. 77–85, http://dx.doi.org/10.1016/j.hbrcj.2013.02.005Arain, F.M., Pheng, L.S., Modeling for management of variations in building projects (2007) Engineering, Construction and Architectural Management, 14 (5), pp. 420-433., http://dx.doi.org/10.1108/09699980710780737 Bakharya, N.A., Adnan, H., Ibrahim, A. (2015), “A Study of Construction Claim Management Problems in Malaysia”, Procedia Economics and Finance, 23, pp. 63 – 70, http://dx.doi.org/10.1016/S2212-5671(15)00327-5 Bröchner, J., Badenfelt, U. (2011) “Changes and change management in construction and IT projects”, Automation in Construction 20(7), pp. 767–775, http://dx.doi.org/10.1016/j.autcon.2011.01.001 Chappell, D., and Willis, A., (2010), “The architect in practice” 10th Ed, Blackwell Science, Oxford, U.K., ISBN-10: 1405198524, ISBN-13: 978-1405198523Choi, K., Lee, H., Bae, J., and Bilbo, D. (2015), Time-Cost Performance Effect of Change Orders from Accelerated Contract Provisions, Journal of Construction Engineering Management, 142.3., http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0001071 Clough, R. H., and Sears, G. A, (2005), “Construction contracting”, 7th Ed, Wiley, New York., ISBN-10: 0471449881, ISBN-13: 978-0471449881Egan, J.J., Seder, J.E., Anderson, D.L. Practices in construction change order management (2011) AACE International Transactions, 1, pp. 350-361.Galloway, P. (2009), “Design-Build/EPC Contractor’s Heightened Risk-Changes in a Changing World”, Journal of Legal Affairs for Dispute Resolution in Engineering and Construction, 1.1, pp. 7-15, http://dx.doi.org/10.1061/(ASCE)1943-4162(2009)1:1(7) Gunduz, M. (2002), “Change order impact assessment for labor intensive construction”., Ph.D. Thesis, submitted to University of Wisconsin, Madison, USAGunduz, M., Hanna, A.S. (2005), "Benchmarking change order impacts on productivity for electrical and mechanical projects." Building and Environment, 40(8), pp. 1068-1075., http://dx.doi.org/10.1016/j.buildenv.2004.10.004 Hanna, A., Russell, J., Gotzion, T., and Nordheim, E., (1999a), “Impact of change orders on labor efficiency for mechanical construction”, Journal of Construction Engineering Management, 125.3, pp. 176–184. http://dx.doi.org/10.1061/(ASCE)0733-9364(1999)125:3(176) Hanna, A., Russell, J., Nordheim, E., and Bruggink, M, (1999b). “Impact of change orders on labor efficiency for electrical construction.” Journal of Construction Engineering Management, 125.4, pp. 224–232., http://dx.doi.org/10.1061/(ASCE)0733-9364(1999)125:4(224) Hanna, A. and Gunduz, M. (2004), “Impact of change orders on small labor-intensive projects” Journal of Construction Engineering and Management, 130(5), pp. 726-733., http://dx.doi.org/10.1061/(ASCE)0733-9364(2004)130:5(726) Hassanein, A.G., El-Nemr, W., (2007) "Management of change order claims in the Egyptian industrial construction sector", Journal of Financial Management of Property and Construction, Vol. 12 Iss: 1, pp.45 - 60, http://dx.doi.org/10.1108/13664380780001093 Hsieh, T., Lu, S., Wu, C. (2004), “Statistical analysis of causes for change orders in metropolitan public works”, International Journal of Project Management, 22(8), pp. 679–686, http://dx.doi.org/10.1016/j.ijproman.2004.03.005 Hwang, B-G, Low, L.K. (2012), “Construction project change management in Singapore: Status, importance and impact International Journal of Project Management”, 30(7), pp. 817–826, http://dx.doi.org/10.1016/j.ijproman.2011.11.001 Iyer, K.C., Chaphalkar, N.B., Joshi, G.A., (2008), “Understanding time delay disputes in construction contracts”, International Journal of Project Management”, 26(2), pp. 174–184., http://dx.doi.org/10.1016/j.ijproman.2007.05.002 Keane, P., Sertyesilisik, B., and Ross, A. (2010). "Variations and Change Orders on Construction Projects." J. Leg. Aff. Dispute Resolut. Eng. Constr., , 89-96. http://dx.doi.org/10.1061/(ASCE)LA.1943-4170.0000016 Moselhi, O., Charles, L., and Fazio, P., (1991), “Impact of change orders on construction productivity.” Can. J. Civ. Eng., 18(3), 484–492., http://dx.doi.org/10.1139/l91-059 Moselhi, O., Assem, I., and El-Rayes, K, (2005), “Change order impacts on labor productivity.” Journal of Construction Engineering Management, 131.3, pp. 354 –359. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:3(354) O’Brien, J. J. (1998).” Construction change orders”, McGraw-Hill, New York, ISBN-10: 0070482349, ISBN-13: 978-0070482340 Oladapo, A.A. A quantitative assessment of the cost and time impact of variation orders on construction projects (2007) Journal of Engineering, Design and Technology, 5 (1), pp. 35-48., http://dx.doi.org/10.1108/17260530710746597 Perkins, R.A. (2009), “Sources of Changes in Design–Build Contracts for a Governmental Owner”, Journal of Construction Engineering Management, 135(7), pp. 588-593, http://dx.doi.org/10.1109/PICMET.2007.4349546 Rahman, I.A., Memon, A.H., Karim, A.T.A. Significant factors causing cost overruns in large construction projects in Malaysia (2013) Journal of Applied Sciences, 13 (2), pp. 286-293., http://dx.doi.org/10.3923/jas.2013.286.293 Serag, E., Oloufa, A., Malone, L., and Radwan, E. (2010), “Model for Quantifying the Impact of Change Orders on Project Cost for U.S. Roadwork Construction”, Journal of Construction Engineering Management, 136(9), pp. 1015-1027, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000206 Taylor, T., Uddin, M., Goodrum, P., McCoy, A., and Shan, Y. (2012), “Change Orders and Lessons Learned: Knowledge from Statistical Analyses of Engineering Change Orders on Kentucky Highway Projects, Journal of Construction Engineering and Management, 138. 12, pp. 1360-1369, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000550 Thomas, H., Smith, G., and Wright, E. (1991), “Legal Aspects of Oral Change Orders”, Journal of Construction Engineering Management, 117. 1, pp. 148-162, http://dx.doi.org/10.1061/(ASCE)0733-9364(1991)117:1(148) Thomas, H. R., and Napolitan, C. L., (1995), “Quantitative effects of construction changes on labor productivity.” Journal of Construction Engineering Management, 121.3, pp. 290–296. http://dx.doi.org/10.1061/(ASCE)0733-9364(1995)121:3(290) Waddell, D., Sohal, A.S. (1998) "Resistance: a constructive tool for change management", Management Decision, Vol. 36 Iss: 8, pp.543 - 548, http://dx.doi.org/10.1108/00251749810232628 Wilberga, J., Elezia, F., Tommelein, I.D., Lindemann, U. (2015), “Using a Systemic Perspective to Support Engineering Change Management”, Procedia Computer Science, 61, pp. 287 – 292, http://dx.doi.org/10.1016/j.procs.2015.09.217 Wu, C., Hsieh, T., and Cheng, W, (2005). “Statistical analysis of causes for design change in highway construction on Taiwan.” International Journal of Project Management, 23.7, pp. 554–563., http://dx.doi.org/10.1016/j.ijproman.2004.07.010 Yusof, M.N., Abu-Bakar, A.H., (2012), “Knowledge management and growth performance in construction companies: a framework”, Procedia - Social and Behavioral Sciences 62, pp. 128 – 134, http://dx.doi.org/10.1016/j.sbspro.2012.09.022