Measuring the environmental performance of urban regeneration projects using AHP methodology

As the world continues to urbanize, integrated policies to improve the lives of both urban and rural dwellers are needed. It could be claimed that the best way to address such problems in major cities is through sustainable urban regeneration where economical, ecological and social impacts of urbanization are examined and practiced thoroughly. In the literature review, the number of publications and identified key performance indicators are found as insufficient. Also, the key performance indicators identified in publications are insufficient for projectspecific performance measurement. Most of them do not include validation and verification of the models. In this study, specific focus is on the environmental performance dimension of sustainable project performance. Thus, this study aims to provide a source for these problems and to systematically measure the environmental performance of urban regeneration projects. It also provides the formulation of the environmental performance measurement model and defines key performance indicators. The data obtained from the literature review and field studies. The proposed AHP model incorporates 9 performance criteria, and 55 related KPIs. After determining the hierarchical structure of KPIs, they are rated using a 7-point Likert scale questionnaire to identify their priority. Next, AHP process have been conducted by participation of 25 experts. Finally, the environmental performance measurement model for urban regeneration projects has been developed. Study results indicate that “Energy” criteria has the highest priority level for determining the environmental performance of urban transformation projects. Consecutively, “Water” criteria comes after followed by “Land Use” and “Ecology”.

___

Aczél, J., & Saaty, T. L. (1983). Procedures for synthesizing ratio judgements. Journal of Mathematical Psychology, 27(1), 93–102.

Ahadzie, D. K., Proverbs, D. G., & Olomolaiye, P. O. (2008a). Critical success criteria for mass house building projects in developing countries. International Journal of Project Management, 26(6), 675–687. https://doi. org/10.1016/j.ijproman.2007.09.006

Ahadzie, D. K., Proverbs, D. G., & Olomolaiye, P. O. (2008b). Model for predicting the performance of project managers at the construction phase of mass house building projects. Journal of Construction Engineering and Management, 134(8), 618–629.

Akkoyun, I., & Dikbas, A. (2008). Performance in construction: A literature review of research in construction management journals. Project Management Centre, Istanbul Technical University, Turkey.

Aladağ, H., & Işık, Z. (2016). Sustainable Key Performance Indicators for Urban Regeneration Projects. Sigma: Journal of Engineering & Natural Sciences/Mühendislik ve Fen Bilimleri Dergisi, 34(1).

Ali, H. A. E. M., Al-Sulaihi, I. A., & Al-Gahtani, K. S. (2013). Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia. Journal of King Saud University - Engineering Sciences, 25(2), 125–134. https://doi.org/10.1016/j.jksues. 2012.03.002

Arditi, D. (1985). Construction productivity improvement. Journal of Construction Engineering and Management, 111(1), 1–14.

Atkinson, R. (1999). Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. International Journal of Project Management, 17(6), 337–342.

Audit Commission. (2002). Suggested Key Indicators for Economic Regeneration. London: HMSO.

Aull-Hyde, R., Erdogan, S., & Duke, J. M. (2006). An experiment on the consistency of aggregated comparison matrices in AHP. European Journal of Operational Research, 171(1), 290–295.

Babcicky, P. (2013). Rethinking the foundations of sustainability measurement: the limitations of the Environmental Sustainability Index (ESI). Social Indicators Research, 113(1), 133– 157.

Barkley, B., & Saylor, J. H. (1994). Customer-driven project management: A new paradigm in total quality implementation. McGraw-Hill Companies.

Bassioni, H. A., Price, A. D. F., & Hassan, T. M. (2004). Performance measurement in construction. Journal of Management in Engineering, 20(2), 45–50.

Bassioni, H. A., Price, A. D., & Hassan, T. M. (2005). Building a conceptual framework for measuring business performance in construction: an empirical evaluation. Construction Management and Economics, 23(5), 495–507.

Berk, N., Biçen, S., & Seyidova, N. (2017). Study on Measuring of Real Estate Speculative Bubble: Evidence from Turkey. European Journal of Multidisciplinary Studies, 2(5), 334–338.

Blowers, A., & Pain, K. (1999). The unsustainable city? Unruly Cities? Order/ Disorder, 247–298.

Brownlow, S. A., & Watson, S. R. (1987). Structuring multi-attribute value hierarchies. Journal of the Operational Research Society, 38(4), 309–317.

Cabała, P. (2010). Using the analytic hierarchy process in evaluating decision alternatives. Operations Research and Decisions, 20(1), 5–23.

Carbonaro, G., & D′ Arcy, E. (1993). Key issues in property-led urban restructuring: a European perspective. Journal of Property Valuation and Investment, 11(4), 339–353.

Cha, H. S., Kim, J., & Han, J. Y. (2009). Identifying and assessing influence factors on improving waste management performance for building construction projects. Journal of Construction Engineering and Management, 135(7), 647–656.

Cha, Hee Sung, & Kim, C. K. (2011). Quantitative approach for project performance measurement on building construction in South Korea. KSCE Journal of Civil Engineering, 15(8), 1319–1328.

Chan, A. P. C., & Chan, A. P. L. (2004). Key performance indicators for measuring construction success. Benchmarking: An International Journal, 11(2), 203–221. https://doi. org/10.1108/14635770410532624

Chan, A. P. C., Scott, D., & Lam, E. W. M. (2002). Framework of success criteria for design/build projects. Journal of Management in Engineering, 18(3), 120–128.

Chan, A. P. C., & Tam, C. M. (2000). Factors affecting the quality of building projects in Hong Kong. International Journal of Quality & Reliability Management, 17(4/5), 423–442.

Chan, E., & Lee, G. K. L. (2008). Critical factors for improving social sustainability of urban renewal projects. Social Indicators Research, 85(2), 243–256.

Cheng, M. Y., Tsai, H. C., & Lai, Y. Y. (2009). Construction management process reengineering performance measurements. Automation in Construction, 18(2), 183–193. https://doi. org/10.1016/j.autcon.2008.07.005

Constructing Excellence, 2019. Institutional site. Retrieved from: http:// www.constructingexcellence.org.uk.

Couch, C., & Dennemann, A. (2000). Urban regeneration and sustainable development in Britain: The example of the Liverpool Ropewalks Partnership. Cities, 17(2), 137–147.

Council, U. S. G. B. (2013). LEED reference guide for building design and construction. US Green Building Council.

Cullingworth, B., & Nadin, V. (2006). Town and Country Planning in the UK. Routledge.

Dağdeviren, M., Diyar, A., & Mustafa, K. (2004). İŞ DEĞERLENDİRME SÜRECİNDE ANALİTİK HİYERARŞİ PROSESİ VE UYGULAMASI. Gazi Üniversitesi Mühendislik-Mimarlık Fakültesi Dergisi, 19(2).

Dainty, A. R. J., Cheng, M. I., & Moore, D. R. (2003). Redefining performance measures for construction project managers: An empirical evaluation. Construction Management and Economics, 21(2), 209–2018. https://doi. org/10.1080/0144619032000049737

DETR. (1998a). Index of Local Deprivation: A Summary of Results. London: HMSO.

DETR. (1998b). Planning for Sustainable Development: Towards Better Practice. London: HMSO.

DETR. (1998c). Planning for the Communities of the Future. London: HMSO.

DETR. (1998d). Sustainability Counts. London: HMSO.

DETR. (1998e). The Future of Regional Planning Guidance. London: HMSO.

Egan, J. (1998). Rethinking construction: The report of the Construction Task Force to the Deputy Prime Minister, John Prescott, on the scope for improving the quality and efficiency of UK construction. In Structural Engineer. https://doi.org/Construction Task Force. Uk Government

El-Mashaleh, M. S., Edward Minchin, R., & O’Brien, W. J. (2006). Management of Construction Firm Performance Using Benchmarking. Journal of Management in Engineering, 23(1), 10–17. https://doi.org/10.1061/ (asce)0742-597x(2007)23:1(10)

Escobar, M. T., & Moreno-Jimenéz, J. M. (2007). Aggregation of individual preference structures in AHP-group decision making. Group Decision and Negotiation, 16(4), 287–301.

Fang, D. P., Huang, X. Y., & Hinze, J. (2004). Benchmarking Studies on Construction Safety Management in China. Journal of Construction Engineering and Management, 130(3), 424–532. https://doi.org/10.1061/(asce)0733- 9364(2004)130:3(424)

Forman, E. H. (1990). AHP is intended for more than expected value calculations. Decision Sciences, 21(3), 670–672.

Hemphill, L., Berry, J., & McGreal, S. (2004). An indicator-based approach to measuring sustainable urban regeneration performance: part 1, conceptual foundations and methodological framework. Urban Studies, 41(4), 725–755.

Hemphill, L., McGreal, S., & Berry, J. (2004). An indicator-based approach to measuring sustainable urban regeneration performance: Part 2, empirical evaluation and case-study analysis. Urban Studies, 41(4), 757–772.

Horta, I. M., Camanho, A. S., & Da Costa, J. M. (2009). Performance Assessment of Construction Companies Integrating Key Performance Indicators and Data Envelopment Analysis. Journal of Construction Engineering and Management, 136(5), 581–594. https://doi.org/10.1061/(asce)co.1943- 7862.0000145

Hunt, D. V, Lombardi, D. R., Rogers, C. D., & Jefferson, I. (2008). Application of sustainability indicators in decision-making processes for urban regeneration projects. PROCEEDINGS- INSTITUTION OF CIVIL ENGINEERS ENGINEERING SUSTAINABILITY, 161(1), 77. INSTITUTION OF CIVIL ENGINEERS.

ISI, 2012. The envision™ Sustainability Rating System, The Institute for Sustainable Infrastructure. Retrieved from: http://www.sustainableinfrastructure. org/index.cfm.

Işik, Z., & Aladağ, H. (2017). A fuzzy AHP model to assess sustainable performance of the construction industry from urban regeneration perspective. Journal of Civil Engineering and Management, 23(4), 499–509.

Jian, Z., De-nong, Z., & Yu-kun, Z. (1999). Opening a new epoch of architecture and culture in the 21st century. Sub-Theme Reports of the 20th UIA Congress: Architecture of the 21st Century, 23–26.

Jin, Z., Deng, F., Li, H., & Skitmore, M. (2013). Practical Framework for Measuring Performance of International Construction Firms. Journal of Construction Engineering and Management, 139(9), 1154–1167. https:// doi.org/10.1061/(ASCE)CO.1943- 7862.0000718

Johnston, B. (1998). Planning for the communities of the future. Planning, 9. Jones, K., & Kaluarachchi, Y. (2008). Performance measurement and benchmarking of a major innovation programme. Benchmarking: An International Journal, 15(2), 124–136. https:// doi.org/10.1108/14635770810864848

Kagioglu, M., Cooper, R., & Aoudad, G. (2001). Performance management in construction: a conceptual framework. Construction Management and Economics, 19(1), 85–95.

Kaplan, R. S., & Norton, D. P. (1992). The balanced scorecard--measures that drive performance. Harvard Business Review, 70(1), 75–85.

Kaplan, R. S., & Norton, D. P. (2000). The strategy-focused organisation:how balance scorecard companies thrive in the new business environment? Harward Business School.

Keleş, R. (1998). Kentbilim Terimleri Sözlüğü İmge Yayınevi. Ankara.

Kim, S. (2010). Risk performance indexes and measurement systems for mega construction projects. Journal of Civil Engineering and Management, 16(4), 586–594.

Lam, E. W. M., Chan, A. P. C., & Chan, D. W. M. (2007). Benchmarking the performance of design-build projects: Development of project success index. Benchmarking, 14(5), 624–638. https:// doi.org/10.1108/14635770710819290

Langstraat, J. W. (2006). The urban regeneration industry in Leeds: measuring sustainable urban regeneration performance. Earth & Environment, 2(1), 167–210.

Latham, M. (1994). Constructing the team: the final report of the joint government/ industry review of procurement and contractual arrangements in the UK construction industry. London: Her Majesty’s Stationary Office (HMSO).

Lin, G., & Shen, Q. (2007). Measuring the Performance of Value Management Studies in Construction: Critical Review. Journal of Management in Engineering, 23(1), 2–9. https://doi.org/10.1061/(asce) 0742-597x(2007)23:1(2)

Lipovetsky, S. (2009). Comparison of a dozen AHP techniques for global vectors in multiperson decision making and complex hierarchy. 10 International Symposium on the Analytic Hierarchy Process Pittsburgh, EUA. Recuperado de Http://Www. Isahp. Org/2009Proceedings/ Final Papers/46 Lipovetsky AHP Techniques for GlobalVectors REV FIN.

Pdf. Luu, T. Van, Kim, S. Y., Cao, H. L., & Park, Y. M. (2008). Performance measurement of construction firms in developing countries. Construction Management and Economics, 26(4), 373–386. https://doi. org/10.1080/01446190801918706

Maclaren, V. W. (1996). Urban sustainability reporting. Journal of the American Planning Association, 62(2), 184–202.

McCabe, S. (2001). Benchmarking in Construction. London: Blackwell Science.

Michael, F. L., Noor, Z. Z., Zardari, N. H., & Figueroa, M. J. (2013). Analytical hierarchy process application in urban sustainability indicators prioritization. Resources and Environment, 3(5A), 1–5.

Neely, A. D., Adams, C., & Kennerley, M. (2002). The performance prism: The scorecard for measuring and managing business success. In The Performance Prism: The Scorecard for Measuring and Managing Business Success. https://doi.org/10.1108/eb016623

Nudurupati, S., Arshad, T., & Turner, T. (2007). Performance measurement in the construction industry: An action case investigating manufacturing methodologies. Computers in Industry, 58(7), 667–676. https://doi. org/10.1016/j.compind.2007.05.005

Pillai, A. S., Joshi, A., & Rao, K. S. (2002). Performance measurement of R and D projects in a multi-project, concurrent engineering environment. International Journal of Project Management, 20(2), 165–177. https://doi. org/10.1016/S0263-7863(00)00056-9

Punniyamoorthy, M., & Murali, R. (2008). Balanced score for the balanced scorecard: A benchmarking tool. Benchmarking, 15(4), 420–443. https:// doi.org/10.1108/14635770810887230

Ramanathan, R., & Ganesh, L. S. (1994). Group preference aggregation methods employed in AHP: An evaluation and an intrinsic process for deriving members’ weightages. European Journal of Operational Research, 79(2), 249–265.

Rankin, J., Fayek, A. R., Meade, G., Haas, C., & Manseau, A. (2008). Initial metrics and pilot program results for measuring the performance of the Canadian construction industry. Canadian Journal of Civil Engineering, 35(9), 894–907.

Ravetz, J. (1996). Towards a sustainable city region. Town and Country Planning, 152–154. Robertson, H. W. (1997). A construction company’s approach to business performance measurement. Total Quality Management, 8(2–3), 254–255.

Robinson, H. S., Carrillo, P. M., Anumba, C. J., & Al-Ghassani, A. M. (2002). Business performance measurement and improvement strategies in construction organizations. Loughborough: Loughborough University.

Robinson, Herbert S., Anumba, C. J., Carillo, P. M., & Al-Ghassani, A. M. (2005). Business performance measurement practices in construction engineering organisations. Measuring Business Excellence, 9(1), 47–58. https:// doi.org/10.1108/13683040510588800

Rojas, E. M., & Aramvareekul, P. (2003). Is construction labor productivity really declining? Journal of Construction Engineering and Management, 129(1), 41–46.

Saaty, T. L. (1980). The Analytic Hierarchy Process. U.S.A.: McGraw-Hill Companies.

Saaty, T. L. (1994). Fundementals Of Decision Making. In The Analytic Hierarcy Process Series. Pittsburg, PA.: RWS Publications.

Saaty, Thomas L. (2005). Theory and applications of the analytic network process: decision making with benefits, opportunities, costs, and risks. RWS publications.

Saisana, M. (2014). Composite Indicator (s). Encyclopedia of Quality of Life and Well-Being Research, 1156–1161.

Sharma, S. (1995). Applied multivariate techniques. John Wiley & Sons, Inc.

Shen, L.-Y., Ochoa, J. J., Shah, M. N., & Zhang, X. (2011). The application of urban sustainability indicators–A comparison between various practices. Habitat International, 35(1), 17–29.

Sundell, J., Levin, H., Nazaroff, W. W., Cain, W. S., Fisk, W. J., Grimsrud, D. T., … Pickering, A. C. (2011). Ventilation rates and health: multidisciplinary review of the scientific literature. Indoor Air, 21(3), 191–204.

Taleai, M., & Mansourian, A. (2008). Using Delphi-AHP method to survey major factors causing urban plan implementation failure. Journal of Applied Sciences, 8(15), 2746–2751.

Taisei Annual Report, 2007. Taisei Annual Report. Retrieved from: http:// www.taisei.co.jp/english/ir/image/ ar2005/all.

Tekçe, I. (2010). Yüklenici İnşaat Firmaları için Çok Kriterli Performans Ölçme Modeli. İstanbul Tehnical University.

Topal, A. K. (2004). Kavramsal Olarak Kent Nedir ve Türkiye’de Kent Neresidir?

Tsolas, I. E. (2011). Modelling profitability and effectiveness of Greek-listed construction firms: An integrated DEA and ratio analysis. Construction Management and Economics, 29(8), 795–807.

Uğural, M. N., Giritli, H., & Urbański, M. (2020). Determinants of the Turnover Intention of Construction Professionals: A Mediation Analysis. Sustainability, 12(3), 954. doi:10.3390/ su12030954

van Twist, M., Kort, M., & van der Steen, M. (2015). Assessing and appraising the effects of policy for wicked issues: Including unforeseen achievements in the evaluation of the district policy for deprived areas in the Netherlands. International Journal of Public Administration, 38(8), 596–605.

Wackernagel, M., & Rees, W. (1996). Ecological footprint: Reducing human impact on the earth. New Society, Gabriola Island, BC, Canada.

Wang, J., Lin, W., & Huang, Y. H. (2010). A performance-oriented risk management framework for innovative R&D projects. Technovation, 30(11– 12), 601–611. https://doi.org/10.1016/j. technovation.2010.07.003

Westerveld, E. (2003). The Project Excellence Model®: Linking success criteria and critical success factors. International Journal of Project Management, 21(6), 411–418. https://doi. org/10.1016/S0263-7863(02)00112-6

Wong, C. (2000). Indicators in use: challenges to urban and environmental planning in Britain. Town Planning Review, 71(2), 213.

Wong, W. P., & Wong, K. Y. (2008). A review on benchmarking of supply chain performance measures. Benchmarking: An International Journal, 15(1), 25–51. https://doi. org/10.1108/14635770810854335

Yang, H., Yeung, J. F. Y., Chan, A. P. C., Chiang, Y. H., & Chan, D. W. M. (2010). A critical review of performance measurement in construction. Journal of Facilities Management, 8(4), 269–284.

Yazar, K. H. (2006). Sürdürülebilir kentsel gelişme çerçevesinde orta ölçekli kentlere dönük kent planlama yöntem önerisi. Ankara Üniversitesi, Sosyal Bilimler Enstitüsü, Yayınlanmamış Doktora Tezi, Ankara.

Yeung, J. F., Chan, A. P., & Chan, D. W. (2009). Developing a Performance Index for Relationship-Based Construction Projects in Australia: Delphi Study. Journal of Management in Engineering, 25(2), 59–68. https://doi.org/10.1061/ (asce)0742-597x(2009)25:2(59)

Yeung, J. F. Y., Chan, A. P. C., & Chan, D. W. M. (2008). Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong. Construction Management and Economics, 26(3), 277–301. https://doi. org/10.1080/01446190701793688

Yeung, J. F. Y., Chan, A. P. C., Chan, D. W. M., & Li, L. K. (2007). Development of a partnering performance index (PPI) for construction projects in Hong Kong: A Delphi study. Construction Management and Economics, 25(12), 1219–1237. https://doi. org/10.1080/01446190701598673

Yıldız, S. (2018). Sürdürülebilir kentsel dönüşüm değerlemdirme modeli oluşturulması.

Yu, C.-J., & Kang, J. (2011). Acoustic sustainability in urban residential areas. Procedia Environmental Sciences, 10, 471–477.

Yu, I., Kim, K., Jung, Y., & Chin, S. (2007). Comparable Performance Measurement System for Construction Companies. Journal of Management in Engineering, 23(3), 131–139.