CYCLE TIME SEGMENTS OF ELECTRIC ROPE SHOVELS- A CASE STUDY

Monitored cycle times and cycle time segments of three 35 m3 electric rope shovels are given

___

  • Anon (a), 2018. P&H PrevailSystem® Reports, U.K.
  • Anon (b), 2016. http://www.joyglobal.com/productdetails/ 2800xpc
  • Binns, D., 2017. Personal communication, Plymouth, England.
  • Ceylanoğlu, A., 1991. Performance Monitoring of Electrical Power Shovels for Diggability Assessment in Surface Coal Mines. Ph.D. Thesis, METU, Ankara, July 1991 (Unpublished Ph.D. Dissertation).
  • Hindistan, M. A., 1997. Development of a Computer Based monitoring System and Its Usage for Power Shovels’ Monitoring. Ph.D. Thesis, METU, Ankara, November 1991 (Unpublished Ph.D. Dissertation).
  • Mohammadi, M., Rai, P., 2015. Improving Performance of Mining Equipment Through Enhancement of Speed Factor- A Case Study. Intl. Journal of Engineering, IJE Transactions C: Aspects, Vol.28, No:9, September 2015.
  • Özdoğan, M., Özdoğan, H., 2017. Field Performance of a New Generation 35 m3 Range Electric Rope Shovel (2800XPB) – A Case Study. Proceedings Book of 25th IMCET Congress, 11-14 April, 2017, Antalya, Turkey.
  • Özdoğan, M., Özdoğan, H., 2018. Field Performance of a New Generation 45 m3 Range Electric Rope Shovel (4100C) – A Case Study. https://www.researchgate. net/publication/318440839_FIELD_PERFORMANCE_ OF_A_NEW_GENERATION_45_m_3_RANGE_ ELECTRIC_ROPE_SHOVEL-PH4100C-A_Case_ Study.