CYCLE TIME SEGMENTS OF ELECTRIC ROPE SHOVELS- A CASE STUDY
Monitored cycle times and cycle time segments of three 35 m3 electric rope shovels are given
___
- Anon (a), 2018. P&H PrevailSystem® Reports, U.K.
- Anon (b), 2016. http://www.joyglobal.com/productdetails/
2800xpc
- Binns, D., 2017. Personal communication, Plymouth,
England.
- Ceylanoğlu, A., 1991. Performance Monitoring of
Electrical Power Shovels for Diggability Assessment in Surface Coal Mines. Ph.D. Thesis, METU, Ankara, July
1991 (Unpublished Ph.D. Dissertation).
- Hindistan, M. A., 1997. Development of a Computer
Based monitoring System and Its Usage for Power
Shovels’ Monitoring. Ph.D. Thesis, METU, Ankara,
November 1991 (Unpublished Ph.D. Dissertation).
- Mohammadi, M., Rai, P., 2015. Improving Performance
of Mining Equipment Through Enhancement of Speed
Factor- A Case Study. Intl. Journal of Engineering, IJE
Transactions C: Aspects, Vol.28, No:9, September
2015.
- Özdoğan, M., Özdoğan, H., 2017. Field Performance of
a New Generation 35 m3 Range Electric Rope Shovel
(2800XPB) – A Case Study. Proceedings Book of 25th
IMCET Congress, 11-14 April, 2017, Antalya, Turkey.
- Özdoğan, M., Özdoğan, H., 2018. Field Performance of
a New Generation 45 m3 Range Electric Rope Shovel
(4100C) – A Case Study. https://www.researchgate.
net/publication/318440839_FIELD_PERFORMANCE_
OF_A_NEW_GENERATION_45_m_3_RANGE_
ELECTRIC_ROPE_SHOVEL-PH4100C-A_Case_
Study.