The Economic Cost of Dewatering of the “Hajvalia” Mine

The Economic Cost of Dewatering of the “Hajvalia” Mine

The “Hajvalia” mine is flooded after the war of the year 1999. The technical and engineering team of the mine has no access in the mine, primarily in the mine's productivity levels. In order to get mine access it is needed dewatering of the mine site. Amount and quality of the Pb-Zn ore in this mine, proves positive economic indicators for exploitation of these reserves and furthermore expanding of the ore reserves with exploration works. The feasibility study of the “Hajvalia” mine shows positive indicators as IRR=30.49% and NPV = 11.60 US$, with interest rate of 10%, for the 10 years of the time period. In this paper is given brief description of the mine’s economic indicators and worldwide Pb-Zn demand as per justification of mine dewatering process i.e. profitability of the mine. The general cost related on dewatering of “Hajvalia” mine will be calculated in this paper. While it will be avoided calculation cost related on ensuring the stability and ventilation of the mine. Economical calculation will be based on the water volume inside of the mine, based on electricity consumption of the related pumps, needed in the dewatering process. Water volume (m3) is while based on the volume of the flooded mine’s space.

___

Anonym. (2017) www.kosovo-mining.org [Online].

Shala F, Berisha-Shala S, Muqa B, (2014)Trepca, Ristrukturimi Sfidat dhe Perspektiva. Prishtinë: Dr. Frank Karg.

Hall J, (2014)Mine Dewatering and Depressurisation. Adelaide, RPS - group.

Anonym., (2016) Kosovo, E. R. O. O. T.R.O.,. http://www.ero-ks.org/. [Online] [Accessed 2016]. Libicki JS., n.d. The Design of Mine Dewatering Systems in Poland, Wroclaw, Poland: s.n.

LTD, I. K. C., 2006. Ajvalija Mine Assessment, s.l.: s.n.

Mallo S. J., 2011. Mine Dewatering: A Veritable Componenet in Mine Cost Analyses in the Development and Mining of the Lafia-Obi coal , Nigeria. s.l., Wilolud Journals.

Mallo SJ, 2011) Mine Dewatering:A veritable component in mine cost analysis in the development and mining of the Lafia-Obi Coal , Nigeria. Continantal J. Earth Sciences , p. 14.

Libicki SJ, (1979)https://www.imwa.info. [Online] [Accessed May 2016]. Senadhira A, (2014)Optimization of energy Utilization for dewatering system in Bogala Graphite Mine, Aruggammana, Sri lanka , s.l.: KTH Industrial Engineering and Management.

Vosloo JC, (2008)A new minimum cost model for water reticulation systems on deep mines. s.l.:Faculty of Engineering at the North West University.