Reliable real-time information has become an important factor for safe delivery of power to the end-users and productivity of the electric utility and customer pleasure. Communication networks constitute the core of electrical system control applications in industry. The commercial and operational demands of electric utilities need a high-performance data communication network that improves the electrical system performance and provides possibility of a detailed study to predict failures. Supervisory Control and Data Acquisition (SCADA) systems are widely used in industry for supervisory control and data acquisition of industrial processes. Users working in various departments in an electric power company require access to SCADA data. Therefore, a design of cost-effective and reliable network architecture is a very important issue. Each network component has a specific address and the maximum amount of components is restricted for the communication channel and protocol. In this paper, a power control application is studied by using wireless technology, and a SCADA system along with the MODBUS protocol which is one of the most common communication protocols used in industrial environments. The application is carried out in a power distribution center found at the electrical distribution system located in Van, Turkey.

___

  • Chainey, W.E. and Block, W.R. (1994). Recent advances in master station architecture. IEEE Computer Applications in Power, [online] 7(2), pp. 24–29, Available at: http://doi.org/10.1109/67.273784
  • Conroy, E. (2001). Power monitoring and harmonic problems in the modern building. Power Engineering Journal, [online] 15(2), pp. 101–107, Available at: http://doi.org/10.1049/pe:20010207
  • Daponte, P., DiPenta, M. and Mercurio, G. (2004), TransientMeter: A Distributed Measurement System for Power Quality Monitoring. IEEE Transactions on Power Delivery, [online] 19(2), pp. 456–463. Available at: http://doi.org/10.1109/TPWRD.2004.825200
  • Ebata, Y., Hayashi, H., Hasegawa, Y., Komatsu, S., Suzuki, K., (2000). Development of the Intranet-based SCADA (supervisory control and data acquisition system) for power system. In: IEEE Power Engineering Society Winter Meeting 2000, [online] IEEE, 3, pp. 1656–1661, Available at: http://doi.org/10.1109/PESW.2000.847593
  • Ericsson, G.N. (2002). Classification of power systems communications needs and requirements: experiences from case studies at Swedish National Grid. IEEE Transactions on Power Delivery, [online] 17(2), pp. 345-347, Available at: http://doi.org/10.1109/61.997896
  • Ericsson, G.N. (2004). Communication requirements-basis for investment in a utility wide-area network. IEEE Transactions on Power Delivery, [online] 19(1), pp. 92-95, Available at: http://doi.org/10.1109/TPWRD.2003.820208
  • Gagliarducci, M., Lampasi, D.A. and Podestà, L. (2007), GSM-based monitoring and control of photovoltaic power generation. Measurement, [online] 40(3), pp. 314–321, Available at: http://doi.org/10.1016/j.measurement.2006.05.018
  • Gungor, V.C. and Lambert, F.C. (2006), A survey on communication networks for electric system automation. Computer Networks, [online] 50(7), pp. 877–897, Available at: http://doi.org/10.1016/j.comnet.2006.01.005
  • Karacor, M. and Ozdemir, E. (2004). Mobile Phone-Based SCADA Automation. Measurement and Control, [online] 37(9), pp. 268–272, Available at: http://doi.org/10.1177/002029400403700901
  • Lahti, J.P., Shamsuzzoha, A. and Kankaanpaa, T. (2011). Web-based technologies in power plant automation and SCADA systems: A review and evaluation. In: Int. Conf. on Control System, Computing and Engineering 2011, [online] Penang: IEEE, pp. 279-284. Available at: http://doi.org/10.1109/ICCSCE.2011.6190537
  • Lakhoua, M.N. (2010). Surveillance of pumps vibrations using a supervisory control and data acquisition system. Journal of Control Engineering and Applied Informatics. 12(1), pp. 15-20.
  • McGranaghan, M. and Goodman, F. (2005). Technical and System Requirements for Advanced Distribution Automation. In:18th Int. Conf. and Exhibition on Electricity Distribution, [online] Turin: IET, pp.1-5, Available at: http://doi.org/10.1049/cp:20051374
  • Parikh, P.P., Kanabar, M.G. and Sidhu, T.S. (2010). Opportunities and challenges of wireless communication technologies for smart grid applications. IEEE Power and Energy Society General Meeting, 2010, [online] Minneapolis, MN: IEEE, pp. 1–7, 2010. Available at: http://doi.org/10.1109/PES.2010.5589988
  • Ramirez Leyva, F.H., Cuellar, J.P.A., Basilio, R.G.M. and Justo, E.E. (2004). Wireless system for electrical networks testing based on MODBUS protocol. In: 14th Int. Conf. on Electronics, Communications and Computers 2004, [online] IEEE, pp. 58–62, Available at: http://doi.org/10.1109/ICECC.2004.1269549
  • Sagi, M., Atlagic, B., Milinkov, D., Bogovac, B. and Culaja, S. (2012). High-performance distributed SCADA system architecture. In: 16th Mediterranean Electrotechnical Conference 2012, [online] Yasmine Hammamet: IEEE, pp. 152–155, Available at: http://doi.org/10.1109/MELCON.2012.6196402
  • Tanyi, E. and Mbinkar, E (2011). A Wide Area Network for Data Acquisition and Real-time Control of the Cameroon Power System. Journal of Control Engineering and Applied Informatics, 13(1), pp. 5-11.
  • Vigu C., Gota D.I. and Capatana D. (2010). Improving the wind speed estimation algorithms using results obtained in the field. Journal of Control Engineering and Applied Informatics. 12(3), pp. 13-17.
  • Wu, F.F., Moslehi, K. and Bose, A. (2005). Power System Control Centers: Past, Present, and Future. In: Proc. of the IEEE, [online], 93(11), pp. 1890–1908, Available at: http://doi.org/10.1109/JPROC.2005.857499
  • Zecevic, G. (1998). Web based interface to SCADA system. In: Int. Conf. on Power System Technology 1998, [online] Beijing: IEEE, 2, pp. 1218-1221, Available at: http://doi.org/10.1109/ICPST.1998.729279