Termik Santrallerde Boru Yırtılmalarının Araştırılması

Bu çalışmada; katı yakıtlı termik santrallerin plansız devreden çıkma sebeplerinden kazan boru yırtılmaları araştırılmıştır. Araştırma Seyitömer Termik Santralinin 4. ünitesi için yapılmıştır.

Investigation of Pıpe Failures in Thermal Power Plants

Power Plants have a big importance for transforming fossil resources existing in our country into electrical energy since using electricity in the world is increasing continuously. For total production of electricity, with lignite ones are more important than other power plants. One of the biggest defect cutting off production of electricity is boiler tubes failures. In this study, reasons of the tubes failures which cause energy interruption had been researched. Furthermore, for Seyitömer Power Plant, cost of this issue had been calculated. Boiler tubes failures which cause big production lost and negative effect of central life are happened due to corrosion occurred by oxygen, hydrogen damage, acid aggression, tension crack, interior pollution, over heating with short and long time period, and mechanic erosion. This problems make double cost a current issue. Both changing tubes costs and lost energy costs problems are seen on the changing time. The main reasons of tubes failures at Seyitömer Power Plant are corrosion occurred by ash, high heat, welding mistakes, and interior pollution. The biggest reason of the corrosion occurred by ash is that coal used at this central has high ash ratio.

___

  • [1] Bütün, S. , Üretim Yarısını EÜAŞ Karşılıyor, EMO Enerji Toplumsal Haber ve Araştırma Dergisi, Sayı 1, Ankara, 2007
  • [2] Malik, U. A. , Asrar, M. , Al-Ghamdi, M.F., Investigations on the Failure of Boiler Tubes in SWCC Jeddah Power Plant, Kingdom of Saudi Arabia 17s., 1994
  • [3] Mukhopadhyay N.K., Ghosh S., Sinha R.K., Bhattacharya D.K., Remaining life estimation of a service exposed economizer tube, India, 11 s., 1998
  • [4] Ray, A.K., Tiwari, Y.N., Roy, S.K., Remnant life assessment of service-exposed pendent super heater tubes, İndia, 11 s., 2000
  • [5] Small R.F., Economic analysis of boiler tube failures, OMMI Vol. 2, Issue 2. Australia, 2003
  • [6] Husain A., Habib K., Investigation of tubing failure of super-heater boiler from Kuwait Desalination electrical power plant, Kuwait, 6 s., 2005
  • [7] Usman, A. and Khan, A.N., Failure Analysis of Heat Exchanger Tubes, Engineering Failure Analysis, Volume 15, Issues 1–2, P:118–128, 2008
  • [8] Masoud R., Khoshhal A. and Shariati S., CFD modeling of a boilers tube’s rupture,  Applied Thermal Engineering, 26(17-18):2192-2200, 2006
  • [9] Chaudhuri S., Some aspects of metallurgical assessment of boiler tubes-Basic principles and case studies, Materials Science and Engineering: A, V432, I;1–2, P:90–99, 2006
  • [10] Mobin M., Malik A. and Al-Hajri M., Investigations on the failure of economizer tubes in a high-pressure boiler, Journal of Failure Analysis and Prevention, V.8, I.1, pp 69–74, 2008
  • [11] Spidler M.W., Creep deformation rupture and ductility of Esshete 1250, International Journal of Pressure Vessels and Piping, V.85, I.1–2, P.89–98, 2008
  • [12] Ray, A.K. , Tiwari, Y.N. , Roy, S.K. , Creep Rupture Analysis and Remaining Life Assessment of 2,25 CR- 1 Mo Stell Tubes from a Thermal Power Plant, International Journal of Pressure Vessels and Piping, V.87, p.746-752, 2010
  • [13] Reduce Future Boiler Tube Failures, The Babcock and Wilcox Company, Ohia-Usa, 8s., http://www.steamforum.com/pictures/e1013153.pdf, (Erişim: Ağustos 2017)
  • [14] http://www.enerjiatlasi.com/elektrik-uretimi/ (Erişim: Ekim 2017)