Bir giysi montaj hattının tasarımı üzerine karşılaştırmalı etüd
Bir giysi montaj hattının tasarımı üzerine karşılaştırmalı etüd
Assembly line balancing has taken the attention of researchers. There are many theoretical studies which propose mathematical or heuristic methods and some of these studies compare the performances of different assembly line balancing techniques. However, there are few practical studies which solve real world assembly line problem. Besides it is not often to meet a study that compares the performance of proposed heuristics with real world practical assembly line balancing techniques. In this study, the sewing line of a woman blouse was balanced with two different real world practical assembly line balancing techniques (PT-1 and PT- 2) and Rank Positional Weight heuristic(RPW) with different objectives. Firstly, this study aimed to contribute to decrease the deficiency of practical applications on assembly line balancing in literature. The second purpose was to compare the performances of practical techniques PT-1 and PT- 2 with the performance of RPW heuristic. Apart from that, PT-1/RPW and PT-2/RPW combinations were made and the performances of these newly developed techniques, together with the performances of PT-1, PT-2 and RPW were discussed in order to outline some points that can improve the efficiency of assembly lines as the third objective.
___
- 1.Atan, S.A, Ramlan,R., Foong, T. G., 2012, Cycle Time Reduction of a Garment manufacturing Company Using Simulation Technique, Proceedings International Conference of Technology Management, Business and Entrepreneurship (ICTMBE2012),Malaysia.
- 2.Ahmad, S., Bagum, N., Rashed,C.A., Khalil, A.B, and Iqbal, M., 2012, The impacts of alb in apparel supply chain, Asian Journal Of Management Sciences And Education, 1(1), p:12-20.
- 3.Ponnambalam, S. G, Aravindan, P. and Naidu G. M., 1999, A comparative evaluation of assembly line balancing heuristics, International Journal of Advanced Manufacturing Technology, 15, p:577-586.
- 4.Scholl, A. and Becke, C., 2006, State-of-the-art exact and heuristic solution procedures for simple assembly line balancing , European Journal of Operational Research, 168, p:666693.
- 5.Boysen, N., Fliedner, M and Scholl, A. , 2006 , A classification of assembly line balancing problems International Journal of Production Economics, 111, p:509528.
- 6.Unal C., 2013, "A New Line Balancing Algorithm For Manufacturing Cell Transformation In Apparel Industry", Industria Textila, 3, p:155-162.
- 7.Eryuruk, S.H., Kalaoglu, F. and Baskak, M., 2008, Assembly line balancing in a clothing company, Fibres & Textiles in Eastern Europe, 16(1), p: 93-98.
- 8.Eryuruk, S.H., Kalaoglu, F. and Baskak, M., 2011, Assembly Line Balancing By Using Statistical Method in Clothing Production Tekstil ve Konfeksiyon , 21(1), p: 65-71.
- 9.Yao, W., 2011, Study on the Control of Line Balancing for Infants Costume Production, Information Engineering and Applications: International Conference on Information Engineering and Applications(IEA 2011), Springer-Verlag London.
- 10. Eryuruk, S.H., 2012, Clothing assembly line design using simulation and heuristic line balancing techniques, Tekstil ve Konfeksiyon , 22(4), p:360-368.
- 11. Guner, M., Yucel, O. and Unal, C., 2013, Applicability of different line balancing methods in the production of apparel, Tekstil ve Konfeksiyon, 23(1), p:77-84.
- 12. Kumar, N. and Mahto, D., 2013, Assembly line balancing: a review of developments and trends in approach to industrial application, Global Journal of Researches in Engineering: Industrial Engineering, 13(2), p:29-50.
- 13. AOTS, 1992, Management seminar for garment factories, The Association for Overseas Technical Scholarship-Juki Corporation, Turkey.