Selection of Contractors for Middle-Sized Projects in Turkey

In the last decade, there has been a trend rising towards the improvement of the methods for effective contractor evaluation. Governments may have been utilizing these kind of studies during legislation and legal regulations on procurement. To achieve the best value for money, the tender evaluation should consider not only price competitiveness, but also compliance with users’ requirements, reliability of performance, capabilities and experience, qualitative superiority, and whole-life costs. Turkish public authorities arise the need for proper contractor selection approach including factors other than price. A contractor selection model is structured to cover non-price attributes together with the bid price. The concern of the model is the public authorities, who want and need to consider the factors other than price during contractor evaluation process of middle-size and semi-complex projects. The model is tested by a hypothetical scenario which evaluates four contractor candidates. The results show that the model provides a guide for the public client to reward experienced, capable and qualified candidate contractors, and to eliminate incompetent, inexperienced, or underfinanced contractors for the success and quality of works.  Key words:         Procurement, Public Sector, Clients, Contractor Evaluation, Contractor Selection 

___

  • Alsugair, A.M., “Framework for evaluating bids of construction Engineering, 15(2), 72-78 (1999). Management in
  • Al-Jarallah, M., “Construction Management”, 1st Ed., Deanship of Libraries, King Saud University (1993). [3] Barrie, D and Paulson, Construction Management”, 3rd Ed., McGraw-Hill, New York (1992). B. “Professional
  • Merna, A. and Smith, N.J. “Bid evaluation for UK public sector construction contracts”, Proceedings of the Institution of Civil Engineers, 1 (88), 91–105 (1990).
  • Hatush, Z, Skitmore, M. “Criteria for contractor selection” Economics, 15, 19-38 (1997a). Management and
  • PPL 4734. Turkish Public Procurement Law (2003).
  • Lam, K.C., Hu, T., Ng, S.T., Skitmore, R.M. and Cheung, S.O. “A fuzzy neural network approach for contractor Management and Economics, 19,175–88 (2001). Construction
  • Dozzi, P, Hartman, F, Tidsbury, N, and Ashrafi, R. “More-stable Construction Engineering and Management, 122(1), 30-35 (1996). relationships”.
  • Hatush, Z, and Skitmore, M. “Contractor selection using multicriteria utility theory: an additive model”, Building and Environment, 33(2-3), 105-115 (1998).
  • Singh, D. and Tiong, R.L.K. “Contractor Selection Criteria: Investigation of Opinions of Singapore Construction Construction Engineering and Management, 132(9), 998–1008 (2006). Journal of
  • Zavadskas, E.K., Kaklauskas, A., Turskis, Z. and Tamosaitiene, J. “Contractor selection multi- attribute model applying Copras method with grey interval numbers”, 20th EURO Mini Conference: Continuous Optimization and Knowledge-Based Technologies, May 20–23, Lithuania (2008).
  • Russell, J.S. “Decision models for analysis and evaluation Construction Management and Economics, 10, 185–202 (1992). contractors”,
  • Jennings, P., and Holt, G. D. “Prequalification and multi-criteria selection: a measure of contractors’ opinions.” Economics, 16, 651-660 (1998). Management. and
  • Banaitiene, N. and Banaitis, A. “Analysis of criteria for Technological and Economic Development of Economy, 12(4), 276–282 (2006). evaluation”
  • Zavadskas, E.K. and Kaklauskas, A.. “Multiple criteria evaluation of buildings”, Technika, Vilnius (1996).
  • Holt, G.D. “Applying cluster analysis to construction contractor classification” Building and Environment, 31(6), 557-568 (1996).
  • Palaneeswaran, E. and Kumaraswamy, M.M. “Contractor selection for design/build projects” Journal Management, 126(5), 331-339 (2000). Engineering and
  • Topcu, Y.I. A decision model proposal for construction contractor selection in Turkey. Build Environ, 39, 469–81 (2004).
  • Wong, C.H., Holt, G.D. and Cooper, P.A. “Lowest price or value? Investigation of UK construction clients’ tender selection process” Construction Management and Economics, 18, 767-774 (2000).
  • Alarcon, L.F., Mourgues, C. “Performance modeling for Engineering, 18(2), 52-60 (2002). Management in
  • Pongpeng J. and Liston, J. “A multi-criteria model’s survey: state of the art and some necessary capabilities Management and Economics, 21(7), 665–70 (2003). models” Construction
  • Turskis, Z. “Multi-attribute contractors ranking method by applying ordering of feasible alternatives of solutions in terms of preferability technique” Baltic Journal on Sustainability, 14(2), 224-239 (2008).
  • Hatush, Z, Skitmore, M. “Assessment and evaluation of contractor data against client goals using PERT approach” Construction Management and Economics, 15, 327-340 (1997b).
  • Sonmez, M., Yang, J.B. and Holt, G.D. “Addressing the contractor selection problem using an evidential reasoning approach” Engineering Construction Architectural Management, 8(3), 198–210 (2001).
  • Singh, D. and Tiong, R.L.K. “A fuzzy decision framework for contractor selection” Construction Engineering and Management, 131(1), 62-70 (2005).
  • Bendana, R., Cano, A. And Cruz, M.P. “Contractor selection: Journal of Civil Engineering, 35, 473–486 (2008). approach” Canadian
  • Mahdi, I.M., Riley, M.J., Fereig, S.M. and Alex, A.P. “A multi-criteria approach to contractor selection” Engineering Construction Architectural Management, 9(1), 29–37 (2002).
  • Fong, P. S., and Choi, S. K. “Final contractor selection using the analytical hierarchy process” Construction Management and Economics, 18, 547-557 (2000).
  • Cheng, E.W.L and Li, H. “Contractor selection using the analytic network process” Construction Management and Economics, 22, 1021–1032 (2004).
  • Sawalhi, N., Eaton, D. and Rustom, R. “Contractor pre-qualification International Journal of Project Management, 25, 465–474 (2007). State-of-the-art”
  • PPA. Public Procurement Authority Report, Turkey (2006).
  • Waara, F. and Bröchner, J. Price and Nonprice “Criteria for Contractor Selection”, Journal of Construction Engineering and Management, 132 (8), 797–804 (2006).
  • Yılmaz, A. “Construction contractor selection procedure in public procurement by evaluating bid price and non-price criteria: A model proposal” Mimar Sinan Fine Arts University, Institute of Science and Technology, Unpublished Graduate Thesis, Istanbul (2006).