Designing of a Knowledge Base Expert System for Specific Risks Management in BOT Projects

Designing of a Knowledge Base Expert System for Specific Risks Management in BOT Projects

Abstract. Economic growth and development is the most important factor in the development of a country, and infrastructure projects such as water and sewage systems, airports, power plants, etc. are the most important factors for economic growth and development.One of the best methods is the use of BOT (Build Operate Transfer) contracts. Since the BOT projects are usually large, and they took relatively long time, risk management is highly important in these projects. In order to solve such problems that does not have precise algorithms but a complex structure and are based on the knowledge and experience of experts,Expert Systems are the best solution. This paper presents an expert system to manage risks in these types of projects; that can act as an expert assistant for project managers. Initial feasibility was conducted in Beckman method, and its knowledge base is designed on the Rule Base and in a way to be developed in the future without any damage in the Inference Engine. The inference engine of the system is a Forward Chaining,and deductive and inductive methods are used for inference. Increased efficiency, saved time and cost, and high availability are the main benefits of the system.

___

  • Ebrahimnejad, S.; Mousavi, S.M.; and Sirafyanpour, H., Presenting a risk assessment model for BOT projects based on fuzzy multi-criteria decision-making, the Fifth International Conference on Industrial Engineering, 2007.
  • Jabalameli, M.S.; Barzinpoor, F.; Arbab, S.; and Sharifi, M.R., Presenting an expert system for risk management in project-based organizations, the second international conference on the strategic management of projects, 2011.
  • Mosaveghkhah, M.; Yazdian, R.; and Ghalenoei, M., Presenting an expert risk management system in the banking, the first National Conference on Management of Money and Banking, 2013.
  • Monirabbasi, A.; Nasirzadeh, F.; and Emamjomezadeh, H., Identification and management of risks in BOT projects, the second National Congress of Civil Engineering, 2005.
  • Arbab, S.; and Jabalameli, M.S., Presenting a conceptual model for knowledge based risk management, the first International Conference on innovation and management, 2010.
  • Mousavi, S.M.; Kavianpour, J.; and Sirafanpour, H., “Presenting a fuzzy expert system for risk management of projects”, the fifth International Conference on Project Management, 2009.
  • Khanzadi, M.; and Khazaeni, G., A guide to the development of infrastructure through the BOT projects, 1st edition, University of Science and Technology, 2009.
  • Ghazanfari, M.; and Kazemi, Z., The principles of Expert Systems, Third Edition, published by the University of Science and Technology, 2010.
  • Abbas Borzuei, “Management of risk rights between the investee government and projected company in BOT contract projects”, European Online Journal of Natural and Social Science, Vol. 2, no. 3, 2013.
  • V. Thomas, Satyanarayana N. Kalidindi, L. S. Ganesh, “Modelling and Assessment of Critical Risks in BOT road Projects”, Construction Management and Economics, April 2006.
  • Swapan Kumar Bagui, Ambarish Ghosh, “Risk Analysis for a BOT Project”, Jordan journal of Civil engineering, Volume 5, No.3, 2011.
  • Cheng-Min Feng, Chao-Chung Kang, “Risk Identification and Measurement of BOT projects”, Journal of the eastern Asia Society for Transportation studies, Vol.3, No.4, September 1999.
  • Rinaj Pathan, Prof. Dr. S. S. Pimplikar, “Risk Assessment of BOT Road Projects”, IOSR Journal of Mechanical and Civil Engineering Vol. 5, Issue 3, Jan. – Feb. 2013.
  • H. Frank Cervone, “Project Risk Management”, OCLC Systems & Services:International digital library Perspectives, Vol. 22, No. 4, 2006.
  • Sharmila Mane, Dr. S. S. Pimplikar, “Risk Assessment of BOT projects”, International Journal of Computational Engineering Research, Vol. 03, Issue 8, August 2013.