Scheduling Optimization in Automotive Supplier Industry under Sequence Dependent Constraints

In today's production conditions, it is very important for companies to produce products that meet the determined quality standards. In addition to the production of semi-finished products produced in plastic injection lines with high quality and efficiency, it is aimed to reduce the lost time and waste materials in production. Since automobile headlights can be in many different colors, it is necessary to keep the product quality at a high level in the transition between colors in the production made by plastic injection and to reduce the number of defective products caused by color errors. In this study, the problem of a single row-dependent machine to reduce the amount of waste that occurs between color transitions in the plastic injection line of an automotive side-industry company producing headlights is discussed. Tabu Search method, which is one of the heuristic optimization algorithms was used to solve the problem. In the solution, production sequences that will reduce the amount of waste of the products in the production program were created by using the annual data kept by the production department of the factory. The algorithm was run using data from two machines out of 18, saving 134 kg of waste materials. It has been clarified that if the developed algorithm is applied to all machines in the department, productivity and product quality will be increased by saving waste materials.

___

[1] T. Saraç and S. Kaya, “Plasti̇ k enjeksi̇ yon maki̇ neleri̇ ni̇ n vardi̇ ya bazinda çi̇ zelgelenmesi̇ problemi̇ i̇ çi̇ n bi̇ r hedef programlama modeli̇ ,” Journal of Industrial Engineering, vol. 24, pp. 12–26.

[2] T. Eren and E. Güner, “Sira-Bağimli Hazirlik Zamanli İki Ölçütlü Çizelgeleme Problemi: Toplam Tamamlanma Zamani Ve Maksimum Erken Bitirme,” Erciyes University Journal of Science and Technology, vol. 23, no. 1-2, pp. 95–105, 2007.

[3] T. Eren, “Learning and Deteriorating Effects on the Single Machine Scheduling Problems,” International Journal of Engineering Research and Development, vol. 6, no. 1, pp. 15–20, Jan. 2014.

[4] "Digital Conversion on the Way to Industry 4.0", Springer Science and Business Media LLC, 2021

[5] V.F. Viagas, A. Costa, Two novel population based algorithms for the single machine scheduling problem with sequence dependent setup times and release times, Swarm and Evolutionary Computation, Volume 63, 2021, 100869, ISSN 2210-6502, https://doi.org/10.1016/j.swevo.2021.10086.

[6] Y. Zhao and G. Wang, “A dynamic differential evolution algorithm for the dynamic single-machine scheduling problem with sequence-dependent setup times Yue,” Journal of the Operational Research Society, vol. 71, no. 2, pp. 225–236, 2020.

[7] S. Muştu and T. Eren, “The Single Machine Scheduling Problem with Sequence-Dependent Setup Times and a Learning Effect on Processing Times.,” Applied Soft Computing, vol. 71, pp. 291–306, 2018.

[8] P. Perez-Gonzalez and J. M. Framinan, “Single machine scheduling with periodic machine availability,” Computers & Industrial Engineering, vol. 123, pp. 180–188, 2018.

[9] R. M. Souza, S. Ricardo, and M. Felizardo, “Algorithms for job scheduling problems with distinct time windows and general earliness/tardiness penalties,” Computers and Operations Research, vol. 81, pp. 203–215, 2017.

[10] Z. Ceylan, E. Karan, Ç. Bakirci, and S. Sabuncu “Single Machine Scheduling Problem with Sequence Dependent Setup Times : An Application in White Goods I,” International Journal of Multidisciplinary Studies and Innovative Technologies, vol. 3, no. 1, pp. 14–21, 2019.

[11] O. Herr and A. Goel, “Minimising total tardiness for a single machine scheduling problem with family setups and resource constraints,” European Journal of Operational Research, vol. 248, no. 1, pp. 123–135, 2016.

[12] T. Prabhakar, “A Production Scheduling Problem with Sequencing,” Management Science , vol. 21, no. 1, pp. 34–42, 2014.

[13] T. C. E. Cheng, W. C. Lee, and C. C. Wu. “SingleMachine Scheduling with Deteriorating Jobs and PastSequence-Dependent Setup Times.” Applied Mathematical Modelling 35 (4):1861–67,2011. https://doi.org/10.1016/j.apm.2010.10.015.

[14] J.B. Wang and J. X. Li., Single Machine PastSequence-Dependent Setup Times Scheduling with General Position-Dependent and Time-Dependent Learning Effects. Applied Mathematical Modelling 35 (3): 1388–95,2011. https://doi.org/10.1016/j.apm.2010.09.017.

[15] K. Türker and Ç. Sel, “Sira Bağimli Hazirlik Operasyonlari İçin Tek Ekipli Paralel Makinalarda Çizelgeleme Problemine Karma Yaklaşim,” J. Fac. Eng. Arch. Gazi Univ., vol. 26, no. 4, pp. 731–740, 2011.

[16] C. Zhao and H. Tang, “Single machine scheduling with past-sequence-dependent setup times and deteriorating jobs,” Computers & Industrial Engineering, vol. 59, no. 4, pp. 663–666, 2010.

[17] J.-B. Wang, D. Wang, L.-Y. Wang, L. Lin, N. Yin, and W.-W. Wang, “Single machine scheduling with exponential time-dependent learning effect and pastsequence-dependent setup times,” Computers & Mathematics with Applications, vol. 57, no. 1, pp. 9–16, 2009.

[18] D. Biskup and J. Herrmann. “Single-Machine Scheduling against Due Dates with Past-SequenceDependent Setup Times”, European Journal of Operational Research 191 (2): 587–92,2008. https://doi.org/10.1016/j.ejor.2007.08.028.

[19] S. Karabati and C. Akkan., “Minimizing Sum of Completion Times on a Single Machine with SequenceDependent Family Setup Times.” Journal of the Operational Research Society 57 (3): 271–80,2006. https://doi.org/10.1057/palgrave.jors.2601989.

[20] G. Rabadi, M. Mollaghasemi, G.C. Anagnostopoulos, “A Branch-And-Bound Algorithm For The Early/Tardy Machine Scheduling Problem With A Common Due-Date And Sequence Dependent Setup Time,” Computers and Operations Research, 31, 1727–1751, 2004.

[21] S.R. Gupta and J. S. Smith. “Algorithms for Single Machine Total Tardiness Scheduling with Sequence Dependent Setups.” European Journal of Operational Research 175 (2): 722–39,2006. https://doi.org/10.1016/j.ejor.2005.05.018.

[22] V. A. Armentano and R. Mazzini. “A Genetic Algorithm for Scheduling on a Single Machine with Set-up Times and Due Dates.” Production Planning and Control 11 (7): 713–20, 2000. https://doi.org/10.1080/095372800432188.

[23] Y.H. Lee, K. Bhaskaran and M. Pinedo. “A Heuristic to Minimize the Total Weighted Tardiness with Sequence-Dependent Setups.” IIE Transactions (Institute of Industrial Engineers) 29 (1): 45–52,1997. https://doi.org/10.1080/07408179708966311.

[24] K.C. Tan and R. Narasimhan. “Minimizing Tardiness on a Single Processor with Sequence-Dependent Setup Times: A Simulated Annealing Approach.” Omega 25 (6): 619–34, 1997.https://doi.org/10.1016/S0305- 0483(97)00024-8.

[25] H. J. Shin, C.-O. Kim, and S. S. Kim, “A Tabu Search Algorithm for Single Machine Scheduling with Release Times, Due Dates, and Sequence-Dependent Set-up Times,” The International Journal of Advanced Manufacturing Technology, vol. 19, no. 11, pp. 859–866, 2002.

[26] P.A. Rubinand and G. L. Ragatz. “Scheduling in a Sequence Dependent Setup Environment with Genetic Search.” Computers and Operations Research 22 (1): 85– 99,1995. https://doi.org/10.1016/0305-0548(93)E0021-K.

[27] F. Glover, “Tabu Search-Part I”, ORSA Journal on Computing, Cilt 1, No 3, 190-206, 1989.

[28] F. Glover, “Tabu Search-Part II”, ORSA Journal on Computing, Cilt 2, No 1, 4-32 1990

[29] S. Özyön , C. Yaşar ve H. Temurtaş , "Ham Enerji Kaynaği Kisitli Termik Birim İçeren Sistemlerde Çevresel Ekonomik Güç Dağitimi Probleminin Çözümü", Eskişehir Osmangazi Üniversitesi Mühendislik ve Mimarlik Fakültesi Dergisi, c. 24, sayi. 1, ss. 47-72, Haz. 2011

[30] F. Glover and M. Laguna, “Tabu Search,” Tabu Search, no. July, 1997, doi: 10.1007/978-1-4615-6089-0.

[31] J. Xu, M. Sohoni, M. McCleery, and T. G. Bailey, “A dynamic neighborhood based tabu search algorithm for real-world flight instructor scheduling problems,” Eur. J. Oper. Res., vol. 169, no. 3, pp. 978–993, 2006, doi: 10.1016/j.ejor.2004.08.023.

[32] A. M. Mohammed and S. O. Duffuaa, “A tabu search based algorithm for the optimal design of multiobjective multi-product supply chain networks,” Expert Syst. Appl., vol. 140, p. 112808, 2020, doi: 10.1016/j.eswa.2019.07.025.

[33] A. Y. Abdelaziz, F. M. Mohamed, S. F. Mekhamer, and M. A. L. Badr, “Distribution system reconfiguration using a modified Tabu Search algorithm,” Electr. Power Syst. Res., vol. 80, no. 8, pp. 943–953, 2010, doi: 10.1016/j.epsr.2010.01.001.

[34] Wan, Guohua, and Benjamin P.-C. Yen, “Tabu Search for Single Machine Scheduling with Distinct Due Windows and Weighted Earliness/Tardiness Penalties.,” European Journal ofOperational Research, vol. 142, no. 2, pp. 271–281, 2002.
ACADEMIC PLATFORM-JOURNAL OF ENGINEERING AND SCIENCE-Cover
  • ISSN: 2147-4575
  • Yayın Aralığı: Yılda 3 Sayı
  • Başlangıç: 2013
  • Yayıncı: Akademik Perspektif Derneği
Sayıdaki Diğer Makaleler

Çok Amaçlı Salonlarda Değiştirilebilir Akustik Tasarım: Sinema Anadolu Çok Amaçlı Salonu Örneği

Okan Şimşek

ECU Oriented Simplified Diesel Engine Model

Şenol GÜLGÖNÜL, NEDİM SÖZBİR

Nickel (Ni+2) Adsorption on Borax Production Waste from Industrial Wastewater

FATMA TUĞÇE ŞENBERBER, Esma Burcu RONA, Meral Yıldırım ÖZEN, Emek Möröydor DERUN

Microstructural Evaluation and Influence of Welding Parameters on Electrode Plunge Depth in Resistance Spot Welded Dissimilar DP800HF/1200M Steel Joints

Melih KEKİK, Fatih ÖZEN, Erdinç İLHAN, Salim ASLANLAR

Düzlem Çelik Çerçevede Perde Tipinin ve Perde Elemanının Performansa Olan Etkilerinin Monotonik Yüklemeyle İncelenmesi

M. Berker ALICIOĞLU

The Effect of Aerophine 3418A Collector Dosage on Niğde (Ulukışla-Madenköy) Complex Pb-Zn Sulphide Ore Flotation

Tevfik AGACAYAK, Nur Benan YİLMAZ

On the Energy Absorption Capability of Metallic Tubes Subjected to the Radial Wall Crushing Process

Yaşar KAHRAMAN

A Methodology for Explicit Representation of the Stochastic Demand due to Electric Vehicles in Generation Expansion Planning Problems

Hatice Tekiner MOGULKOC

Nükleer Kabuk Modeli ile Ne İzotoplarının Nükleer Yapısının İncelenmesi

Serkan AKKOYUN, TUNCAY BAYRAM

Lorenz Kaotik Sisteminin Doğrusal Geri Beslemeli, Yüksek Kazanç, Yüksek Frekans ve Model Öngörülü Kontrol ile Denetlenmesi

MURAT ERHAN ÇİMEN, Muhammed Ali PALA, ÖMER FARUK BOYRAZ, Zeynep GARİP, Akif AKGÜL, Mustafa Zahid YILDIZ, ALİ FUAT BOZ