ОПЫТ ОРГАНИЗАЦИИ ПРОЕКТНОЙ РАБОТЫ

ОПЫТ ОРГАНИЗАЦИИ ПРОЕКТНОЙ РАБОТЫ

___

1. http://tech-db.istc.ru/ISTC/sc.nsf/html/pra.htm?open&id=5518. - Theoretical basis for the development and basic construction peculiarities of flexible production systems with multiconnected structures. KR-531. – М.: ISTC, 2003.

2. http://tech-db.istc.ru/ISTC/sc.nsf/html/projects.htm?open&id=KR-531. Theoretical Development and Construction Peculiarities of Flexible Production Systems with Multi connected Structures. KR-531. – М.: ISTC. 2003.

3. Unification of calculating procedures in engineering project of multi connected flexible manufacturing system (FMS). – Science and computing. Proceeding 6-th ISTC Scientific advisory committee seminar. V.2. Moscow, Russia, September 15-19, 2003, p. 553-562.

4. http://tech-db.istc.ru/ISTC/sc.nsf/html/projects.htm?open&id=KR-1109. System Development of Forming Probable (Prognostic) Characters of the Flexible Manufacture with Multi Connected Structure via Monitoring of Its Processes. KR-1109. – М.: ISTC, 2004.

5. Multi Connected Flexible Manufacturing System. Specific Targeted Research Project in 6th Framework Programme European Union // Kyrgyzstan, UK, Italy, Turkey, Russia, Ukraine, Poland. – B.: KSTU, № FP6-516722, 2004.

6. New generation of multi connected systems of flexible automation and the ways of strategic control of them. - Proceedings of ESDA2006. 8th Biennial ASME Conference on Engineering Systems Design and Analysis. July 4 -7, 2006, Torino, Italy. – 10 р.

7. Системы автоматизации нового поколения. - Б.: Janar Electronics, 2009. - 468 с.

8. Автоматизация, робототехника, мехатроника. Управляемые механизмы. - Б.: ГПС КР, 2010. - 272 с.