KAZI ARINI SINIRI OPTİMİZASYONU İÇİN GELİŞTİRİLEN YÖNTEMLER VE ÖRNEK BİR UYGULAMA

Öz Kazı arını sınırı optimizasyonu, yeraltı maden planlama ve tasarım sürecindeki optimizasyon

___

  • Alford, C., 1995. Optimisation in Underground Mine Design, 25th Application of Computers and Operations Research in The Mineral Industry, The Australian Institute of Mining and Metallurgy, pp. 213-218.
  • Ataee-Pour, M., 2000. A Heuristic Algorithm to Op - timise Stope Boundaries, PhD thesis, University of Wollongong, Australia, pp. (2) 24-60, (3) 18-36.
  • Ataee-Pour, M., 2005. A Critical Survey of the Existing Stope Layout Optimization Techniques, Journal of Mining Science, 41(5):447-466.
  • Bai, X., Marcotte, D., Simon, R., 2013. Under - ground Stope Optimization with Network Flow Method, Computer and Geoscience, (52), pp. 361–371.
  • Brazil, M., Thomas, D.A., Weng, J.F., 1998. Gradi - ent-Constrained Minimal Steiner Trees, DIMACS: Series in Discrete Mathematics and Theoretical Computer Science, 40: 23–38.
  • Brazil, M., Rubinstein, J. H., Thomas, D. A., Weng J. F., Wormald, N. C., 2001. Gradient-Constrained Minimum Networks. I. Fundamentals, Journal of Global Optimization, 21 (2):139-155.
  • Brazil, M., Lee D.H., Rubinstein, J. H., Thomas, D.A., Weng, J.F., , 2002. Optimisation in the De - sign of Underground Mine Access, The Transac - tions of the South African Institute of Electrical Engineers, 93(2): 97-103.
  • Brazil, M., Thomas, D.A., Weng, J.F., Lee, D.H., Rubinstein, J.H., 2005. Cost Optimization for Un - derground Mining Networks, Optimization and Engineering, 6(2): 241–256.
  • Brazil, M., Thomas, D.A., 2007. Network Optimi - sation for the Design of Underground Mines, Net - works ,49: 40–50.
  • Carlyle, M., Eaves, 2001. Underground Planning at Stillwater Mining Company, Interfaces, 31(4): 50-60.
  • Cawrse, I, 2001. Multiple Pass Floating Stope Process, 4th Biennial Strategic Mine Planning Conference, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 87-94.
  • Cawrse, I., 2007. Multiple Pass Floating Stope Process, Strategic Mine Planning Conference, Perth, Australia, pp. 87–94.
  • Cheimanoff, N. M., Deliac, E. P., Mallet, J. L., 1989. GEOCAD : An Alternative CAD and Arti - ficial Intelligence Tool that Helps Moving From Geological Resources to Mineable Reserves, 21st Application of Computers and Operations Research in the Mineral Industry : 21st Interna - tional APCOM Symposium, pp. 471-478.
  • Deraisme, J., De Fouquet, C., Fraisse, H, 1984. Geostatistical Orebody Model for Computer Op - timization of Profits from Different Underground Mining Methods, 18th APCOM Symposium Lon - don, England, pp. 583-590.
  • Erdoğan, G., 2017. Yeraltı Ocaklarında Bilgisayar Destekli Maden Tasarımı ve Kazı Arınlarının Op - timizasyonu, Yüksek Lisans Tezi, Eskişehir Os - mangazi Üniversitesi.
  • Erdogan, G., Cigla, M., Topal, E., Yavuz, M., 2017. Implementation and Comparison of Four Stope Boundary Optimisation Algorithms in an Existing Underground Mine, International Journal of Mining, Reclamation and Environment 31 (6), 389-403
  • Kuchta M., Newman, A., Topal, E, 2004. Imple - menting a Production Schedule at LKAB’s Kiruna Mine, Interfaces, 34(2): 124-134.
  • Lee, D. H., 1989. Industrial Case Studies of Stein - er Trees, NATO Advanced Research Workshop on Topological Network Design, Denmark.
  • Little J., 2007. A New Approach to Using Mixed-In - teger Programming for Scheduling Optimisation in Sublevel Stope Mining, Bachelor thesis, Uni - versity of Queensland, Brisbane.
  • Little J., Knights P., Topal E., 2013. Integrated Optimization of Underground Mine Design and Scheduling, Journal of the South African Institute of Mining and Metallurgy, 113, pp. 775–785.
  • Nehring, M., Topal E., 2006. Production Schedule Optimisation in Underground Hard Rock Mining Using Mixed Integer Programming, Australasian Institute of Mining and Metallurgy, Project Evalu - ation, Melbourne, Australia, pp. 169-175
  • Nehring, M., Topal, E., Kizil, M., Knights, P., 2012. Integrated Short- and Medium-Term Underground Mine Production Scheduling, The Journal Of The Southern African Institute Of Mining And Metallur - gy, 112, pp 365-378.
  • O’Sullivan D., Newman A., 2014. Optimiza - tion-based Heuristics for Underground Mine Scheduling, European Journal of Operational Re - search, 241, pp. 248–259.
  • Ovanic, J., Young, D. S., 1995. Economic Optimi - sation of Stope Geometry using Separable Pro - gramming with Special Branch and Bound Tech - niques, Third Canadian Conference on Computer Applications in the Mineral Industry, McGill Uni - versity, Montreal,pp. 129-35.
  • Riddle, JM., 1977. A Dynamic Programming Solu - tion of a Block Caving Mine Layout, Proceedings The 14th APCOM Symposium, Society of Mining Engineers-American Institute of Mining, Metallur - gy, and Petroleum Engineers, New York,pp. 767- 780.
  • Sandanayake, D., 2014. Stope Boundary Optimi - sation in Underground Mining Based on a Heuris - tic Approach, PhD Thesis, Curtin University.
  • Sandanayake D, Topal E, Asad M., 2015a. De - signing an Optimal Stope Layout for Underground Mining Based on a Heuristic Algorithm, Interna - tional Journal of Mining Science and Technology 25, pp. 767–772.
  • Sandanayake D, Topal E, Asad M., 2015b. A Heu - ristic Approach to Optimal Design of an Under - ground Mine Stope Layout, Applied Soft Comput - ing, 30, pp. 595–603.
  • Serra, J., 1982. Image Analysis and Mathemati - cal Morphology, Academic Press, New York. Sens, J., Topal, E., 2009. A New Algorithm for Stope Boundary Optimisation, Ausimm New Leaders Conference, 2009(4), pp. 25-28.
  • Topal E., 2003. Advanced Underground Mine Scheduling Using Mixed Integer Programming, PhD thesis, Colorado School of Mines.
  • Topal, E., Sens, J., 2010. A New Algorithm for Stope Boundary Optimization, Journal of Coal Science & Engineering, 16 (2), pp. 113-119.
  • Trout L.P., 1995, Underground Mine Production Scheduling Using Mixed Integer Programming, Proceedings in the 25th International APCOM Symposium, The Australasian Institute of Mining and Metallurgy, Melbourne, pp. 395-400.
  • Wang, H., Webber, T., 2012. An Innovation of Practical Underground Stope Design Optimiza - tion and Cut-off Grade Calculation, SME Annual Meeting, WA.
  • Winkler, B., 1996. Using MILP to Optimize Peri - od Fix Costs in Complex Mine Sequencing and Scheduling Problems, APCOM Symposium, Pennsylvania State University, pp. 441–446.