KAZI ARINI SINIRI OPTİMİZASYONU İÇİN GELİŞTİRİLEN YÖNTEMLER VE ÖRNEK BİR UYGULAMA
Öz
Kazı arını sınırı optimizasyonu, yeraltı maden planlama ve tasarım sürecindeki optimizasyon
___
- Alford, C., 1995. Optimisation in Underground
Mine Design, 25th Application of Computers and
Operations Research in The Mineral Industry,
The Australian Institute of Mining and Metallurgy,
pp. 213-218.
- Ataee-Pour, M., 2000. A Heuristic Algorithm to Op
-
timise Stope Boundaries, PhD thesis, University of
Wollongong, Australia, pp. (2) 24-60, (3) 18-36.
- Ataee-Pour, M., 2005. A Critical Survey of the
Existing Stope Layout Optimization Techniques,
Journal of Mining Science, 41(5):447-466.
- Bai, X., Marcotte, D., Simon, R., 2013. Under
-
ground Stope Optimization with Network Flow
Method, Computer and Geoscience, (52), pp.
361–371.
- Brazil, M., Thomas, D.A., Weng, J.F., 1998. Gradi
-
ent-Constrained Minimal Steiner Trees, DIMACS:
Series in Discrete Mathematics and Theoretical
Computer Science, 40: 23–38.
- Brazil, M., Rubinstein, J. H., Thomas, D. A., Weng
J. F., Wormald, N. C., 2001. Gradient-Constrained
Minimum Networks. I. Fundamentals, Journal of
Global Optimization, 21 (2):139-155.
- Brazil, M., Lee D.H., Rubinstein, J. H., Thomas,
D.A., Weng, J.F., , 2002. Optimisation in the De
-
sign of Underground Mine Access, The Transac
-
tions of the South African Institute of Electrical
Engineers, 93(2): 97-103.
- Brazil, M., Thomas, D.A., Weng, J.F., Lee, D.H.,
Rubinstein, J.H., 2005. Cost Optimization for Un
-
derground Mining Networks, Optimization and
Engineering, 6(2): 241–256.
- Brazil, M., Thomas, D.A., 2007. Network Optimi
-
sation for the Design of Underground Mines, Net
-
works ,49: 40–50.
- Carlyle, M., Eaves, 2001. Underground Planning
at Stillwater Mining Company, Interfaces, 31(4):
50-60.
- Cawrse, I, 2001. Multiple Pass Floating Stope
Process, 4th Biennial Strategic Mine Planning
Conference, The Australasian Institute of Mining
and Metallurgy, Melbourne, pp. 87-94.
- Cawrse, I., 2007. Multiple Pass Floating Stope
Process, Strategic Mine Planning Conference,
Perth, Australia, pp. 87–94.
- Cheimanoff, N. M., Deliac, E. P., Mallet, J. L.,
1989. GEOCAD : An Alternative CAD and Arti
-
ficial Intelligence Tool that Helps Moving From
Geological Resources to Mineable Reserves,
21st Application of Computers and Operations
Research in the Mineral Industry : 21st Interna
-
tional APCOM Symposium, pp. 471-478.
- Deraisme, J., De Fouquet, C., Fraisse, H, 1984.
Geostatistical Orebody Model for Computer Op
-
timization of Profits from Different Underground
Mining Methods, 18th APCOM Symposium Lon
-
don, England, pp. 583-590.
- Erdoğan, G., 2017. Yeraltı Ocaklarında Bilgisayar
Destekli Maden Tasarımı ve Kazı Arınlarının Op
-
timizasyonu, Yüksek Lisans Tezi, Eskişehir Os
-
mangazi Üniversitesi.
- Erdogan, G., Cigla, M., Topal, E., Yavuz, M.,
2017. Implementation and Comparison of Four
Stope Boundary Optimisation Algorithms in an
Existing Underground Mine, International Journal
of Mining, Reclamation and Environment 31 (6),
389-403
- Kuchta M., Newman, A., Topal, E, 2004. Imple
-
menting a Production Schedule at LKAB’s Kiruna
Mine, Interfaces, 34(2): 124-134.
- Lee, D. H., 1989. Industrial Case Studies of Stein
-
er Trees, NATO Advanced Research Workshop
on Topological Network Design, Denmark.
- Little J., 2007. A New Approach to Using Mixed-In
-
teger Programming for Scheduling Optimisation
in Sublevel Stope Mining, Bachelor thesis, Uni
-
versity of Queensland, Brisbane.
- Little J., Knights P., Topal E., 2013. Integrated
Optimization of Underground Mine Design and
Scheduling, Journal of the South African Institute
of Mining and Metallurgy, 113, pp. 775–785.
- Nehring, M., Topal E., 2006. Production Schedule
Optimisation in Underground Hard Rock Mining
Using Mixed Integer Programming, Australasian
Institute of Mining and Metallurgy, Project Evalu
-
ation, Melbourne, Australia, pp. 169-175
- Nehring, M., Topal, E., Kizil, M., Knights, P., 2012.
Integrated Short- and Medium-Term Underground
Mine Production Scheduling, The Journal Of The
Southern African Institute Of Mining And Metallur
-
gy, 112, pp 365-378.
- O’Sullivan D., Newman A., 2014. Optimiza
-
tion-based Heuristics for Underground Mine
Scheduling, European Journal of Operational Re
-
search, 241, pp. 248–259.
- Ovanic, J., Young, D. S., 1995. Economic Optimi
-
sation of Stope Geometry using Separable Pro
-
gramming with Special Branch and Bound Tech
-
niques, Third Canadian Conference on Computer
Applications in the Mineral Industry, McGill Uni
-
versity, Montreal,pp. 129-35.
- Riddle, JM., 1977. A Dynamic Programming Solu
-
tion of a Block Caving Mine Layout, Proceedings
The 14th APCOM Symposium, Society of Mining
Engineers-American Institute of Mining, Metallur
-
gy, and Petroleum Engineers, New York,pp. 767-
780.
- Sandanayake, D., 2014. Stope Boundary Optimi
-
sation in Underground Mining Based on a Heuris
-
tic Approach, PhD Thesis, Curtin University.
- Sandanayake D, Topal E, Asad M., 2015a. De
-
signing an Optimal Stope Layout for Underground
Mining Based on a Heuristic Algorithm, Interna
-
tional Journal of Mining Science and Technology
25, pp. 767–772.
- Sandanayake D, Topal E, Asad M., 2015b. A Heu
-
ristic Approach to Optimal Design of an Under
-
ground Mine Stope Layout, Applied Soft Comput
-
ing, 30, pp. 595–603.
- Serra, J., 1982. Image Analysis and Mathemati
-
cal Morphology, Academic Press, New York.
Sens, J., Topal, E., 2009. A New Algorithm for
Stope Boundary Optimisation, Ausimm New
Leaders Conference, 2009(4), pp. 25-28.
- Topal E., 2003. Advanced Underground Mine
Scheduling Using Mixed Integer Programming,
PhD thesis, Colorado School of Mines.
- Topal, E., Sens, J., 2010. A New Algorithm for
Stope Boundary Optimization, Journal of Coal
Science & Engineering, 16 (2), pp. 113-119.
- Trout L.P., 1995, Underground Mine Production
Scheduling Using Mixed Integer Programming,
Proceedings in the 25th International APCOM
Symposium, The Australasian Institute of Mining
and Metallurgy, Melbourne, pp. 395-400.
- Wang, H., Webber, T., 2012. An Innovation of
Practical Underground Stope Design Optimiza
-
tion and Cut-off Grade Calculation, SME Annual
Meeting, WA.
- Winkler, B., 1996. Using MILP to Optimize Peri
-
od Fix Costs in Complex Mine Sequencing and
Scheduling Problems, APCOM Symposium,
Pennsylvania State University, pp. 441–446.