CYCLE TIME SEGMENTS OF ELECTRIC ROPE SHOVELS- A CASE STUDY

Öz Monitored cycle times and cycle time segments of three 35 m3 electric rope shovels are given

___

Anon (a), 2018. P&H PrevailSystem® Reports, U.K.

Anon (b), 2016. http://www.joyglobal.com/productdetails/ 2800xpc

Binns, D., 2017. Personal communication, Plymouth, England.

Ceylanoğlu, A., 1991. Performance Monitoring of Electrical Power Shovels for Diggability Assessment in Surface Coal Mines. Ph.D. Thesis, METU, Ankara, July 1991 (Unpublished Ph.D. Dissertation).

Hindistan, M. A., 1997. Development of a Computer Based monitoring System and Its Usage for Power Shovels’ Monitoring. Ph.D. Thesis, METU, Ankara, November 1991 (Unpublished Ph.D. Dissertation).

Mohammadi, M., Rai, P., 2015. Improving Performance of Mining Equipment Through Enhancement of Speed Factor- A Case Study. Intl. Journal of Engineering, IJE Transactions C: Aspects, Vol.28, No:9, September 2015.

Özdoğan, M., Özdoğan, H., 2017. Field Performance of a New Generation 35 m3 Range Electric Rope Shovel (2800XPB) – A Case Study. Proceedings Book of 25th IMCET Congress, 11-14 April, 2017, Antalya, Turkey.

Özdoğan, M., Özdoğan, H., 2018. Field Performance of a New Generation 45 m3 Range Electric Rope Shovel (4100C) – A Case Study. https://www.researchgate. net/publication/318440839_FIELD_PERFORMANCE_ OF_A_NEW_GENERATION_45_m_3_RANGE_ ELECTRIC_ROPE_SHOVEL-PH4100C-A_Case_ Study.