Öz
Monitored cycle times and cycle time segments of three 35 m3 electric rope shovels are given
___
Anon (a), 2018. P&H PrevailSystem® Reports, U.K.
Anon (b), 2016. http://www.joyglobal.com/productdetails/
2800xpc
Binns, D., 2017. Personal communication, Plymouth,
England.
Ceylanoğlu, A., 1991. Performance Monitoring of
Electrical Power Shovels for Diggability Assessment in Surface Coal Mines. Ph.D. Thesis, METU, Ankara, July
1991 (Unpublished Ph.D. Dissertation).
Hindistan, M. A., 1997. Development of a Computer
Based monitoring System and Its Usage for Power
Shovels’ Monitoring. Ph.D. Thesis, METU, Ankara,
November 1991 (Unpublished Ph.D. Dissertation).
Mohammadi, M., Rai, P., 2015. Improving Performance
of Mining Equipment Through Enhancement of Speed
Factor- A Case Study. Intl. Journal of Engineering, IJE
Transactions C: Aspects, Vol.28, No:9, September
2015.
Özdoğan, M., Özdoğan, H., 2017. Field Performance of
a New Generation 35 m3 Range Electric Rope Shovel
(2800XPB) – A Case Study. Proceedings Book of 25th
IMCET Congress, 11-14 April, 2017, Antalya, Turkey.
Özdoğan, M., Özdoğan, H., 2018. Field Performance of
a New Generation 45 m3 Range Electric Rope Shovel
(4100C) – A Case Study. https://www.researchgate.
net/publication/318440839_FIELD_PERFORMANCE_
OF_A_NEW_GENERATION_45_m_3_RANGE_
ELECTRIC_ROPE_SHOVEL-PH4100C-A_Case_
Study.